Offshore Energy
  • Fossil Energy
  • Subsea
  • Alternative Fuels
  • Hydrogen
  • Marine Energy
  • More news
JobsNewsletter
Offshore Energy logo

Your trusted source for global offshore energy news, part of the Navingo network.

Topics
  • Fossil Energy
  • Subsea
  • Alternative Fuels
  • Hydrogen
  • Marine Energy
Network
  • Offshore Energy
  • Offshore Wind
  • NavalToday
  • Dredging Today
Company
  • Advertising
  • Newsletter
  • Jobs
  • Report your news
  • Privacy

© 2026 Navingo. All rights reserved.

Home›Clean Fuel›Wärtsilä bags 36 engines order for Arctic LNG 2 carriers
Clean Fuel

January 28, 2021 · about 5 years ago

Wärtsilä bags 36 engines order for Arctic LNG 2 carriers

The Finnish technology group Wärtsilä has been contracted to supply dual-fuel engines for six new 172,500 cbm Arctic LNG 2 carriers.

2 minutes read
  • LinkedIn
  • X
  • Email
Wärtsilä 46DF (8L46FDF) product image rendering with white background
Courtesy of Wärtsilä

The Finnish technology group Wärtsilä has been contracted to supply dual-fuel engines for six new 172,500 cbm Arctic LNG 2 carriers.

The order, which is valued at more than EUR 100 million, was placed in December 2020 by Daewoo Shipbuilding and Marine Engineering.

The order includes an option for a further four ships., Wärtsilä noted in its statement on Thursday.

“This is a major newbuild project, and we were able to propose a technical solution that ensures clear benefits and cost savings for the customer,” says Östen Lindell , sales director, East Asia & China, Wärtsilä Marine Power.

Each vessel will be fitted with six Wärtsilä 46DF dual-fuel engines, plus gas valve units and auxiliaries.

Deliveries of the equipment will commence in August 2021, Wärtsilä said.

Wärtsilä has earlier supplied the engines for 15 ships serving the Yamal LNG project, as well as numerous dual-fuel engines for other LNG carriers built at the Daewoo yard.

Related Articles

Clean Fuel

Novatek completes Arctic LNG 2 fleet formation

1 min read

The Novatek-led Arctic LNG 2 envisages constructing three LNG liquefaction trains of 6.6 million tons per annum each, as well as a cumulative gas condensate production capacity of 1.6 million tons per annum.

The total LNG capacity of the three liquefaction trains will be 19.8 million tons.

The project utilizes a construction concept using gravity-based structure (GBS) platforms to reduce overall capital cost and minimize the project’s environmental footprint in the Arctic zone of Russia.

The project’s participants include Novatek (60 per cent), Total (10 per cent), CNPC (10 per cent), CNOOC (10 per cent) and the consortium of Mitsui and JOGMEC (10 per cent).

Reach the Offshore Energy industry in one go!

Offshore Energy is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow Offshore Energy on:

Filed under

Clean FuelGreen MarineLNGPropulsionShipbuildingInfrastructureVessels

Daily Offshore Energy News in Your Mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1After Fugro, TDI-Brooks selected for surveys offshore Timor-Leste
  2. 2Vessel duo's APAC drilling support jobs boost Solstad's backlog by up to $30 million
  3. 3New BP deal deepens Aker Solutions’ North Sea footprint
  4. 4Wales’ national marine energy test center secures Crown Estate investment

Daily Offshore Energy News in Your Mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free