Offshore Energy
  • Fossil Energy
  • Subsea
  • Alternative Fuels
  • Hydrogen
  • Marine Energy
  • More news
JobsNewsletter
Offshore Energy logo

Your trusted source for global offshore energy news, part of the Navingo network.

Topics
  • Fossil Energy
  • Subsea
  • Alternative Fuels
  • Hydrogen
  • Marine Energy
Network
  • Offshore Energy
  • Offshore Wind
  • NavalToday
  • Dredging Today
Company
  • Advertising
  • Newsletter
  • Jobs
  • Report your news
  • Privacy

© 2026 Navingo. All rights reserved.

Home›Clean Fuel›P&O Cruises’ LNG-fuelled cruise ship Arvia set for delivery
Clean Fuel

November 4, 2022 · about 3 years ago

P&O Cruises’ LNG-fuelled cruise ship Arvia set for delivery

P&O Cruises’ second LNG-powered Excel-class cruise ship Arvia is set for delivery, German shipbuilding company Meyer Werft revealed.

1 minutes read
  • LinkedIn
  • X
  • Email
P&O Cruises’ LNG-fuelled cruise ship Arvia set for delivery
Meyer Werft

P&O Cruises’ second LNG-powered Excel-class cruise ship Arvia is set for delivery, German shipbuilding company Meyer Werft revealed.

As informed, the vessel is expected to leave Papenburg on 5 November, and be transferred on the Ems River to Eemshaven (Netherlands). Arrival in Eemshaven is scheduled for 6 November. After technical and nautical trials, Arvia will set its course for Bremerhaven for delivery to P&O Cruises (UK).

The new cruise ship is equipped with the cleanest propulsion system currently available to the shipping industry, an LNG propulsion system, according to Meyer Werft.

This means that Arvia is built to be future-proof and, in perspective, can even be operated in a climate-neutral manner using green regenerative LNG.

LNG propulsion is seen as a solution that eliminates nitrogen oxides and particulate matter in addition to reducing CO2 emissions, while sulfur oxides are completely eliminated.

Currently, all cruise ships in Meyer Werft’s order book are equipped with this low-emission propulsion system, the firm stressed

Arvia measures over 180,000 GT, is 344.5 metres long, 42 metres wide and identical in construction to her sister ship Iona , which was delivered in 2020.

The cruise ship has 2,614 cabins and is designed to carry 5,200 passengers. The construction of the ship began in February 2021, and the vessel was officially launched this August.

Related Articles

Business Developments & Projects

Meyer Werft: LNG-powered cruise ship Arvia floated out

1 min read

Reach the Offshore Energy industry in one go!

Offshore Energy is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow Offshore Energy on:

Filed under

Clean FuelGreen MarineLNGPropulsionShipbuildingBusiness Developments & ProjectsVessels

Daily Offshore Energy News in Your Mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1Vår Energi bolsters its oil & gas portfolio with wrap-up of Pandion buy
  2. 2LNG-to-FSRU conversion widening Karpowership-backed Kinetics’ gas infrastructure fleet
  3. 3Potential for tidal lagoon in South East Wales being explored
  4. 4After Fugro, TDI-Brooks selected for surveys offshore Timor-Leste

Daily Offshore Energy News in Your Mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free