Offshore Energy
  • Fossil Energy
  • Subsea
  • Alternative Fuels
  • Hydrogen
  • Marine Energy
  • More news
JobsNewsletter
Offshore Energy logo

Your trusted source for global offshore energy news, part of the Navingo network.

Topics
  • Fossil Energy
  • Subsea
  • Alternative Fuels
  • Hydrogen
  • Marine Energy
Network
  • Offshore Energy
  • Offshore Wind
  • NavalToday
  • Dredging Today
Company
  • Advertising
  • Newsletter
  • Jobs
  • Report your news
  • Privacy

© 2026 Navingo. All rights reserved.

Home›Clean Fuel›Clough bags Waitsia Stage 2 EPC job
Clean Fuel

January 11, 2021 · about 5 years ago

Clough bags Waitsia Stage 2 EPC job

Perth-based engineer Clough has bagged the engineering, procurement and construction (EPC) for the Waitsia Stage 2 development.

1 minutes read
  • LinkedIn
  • X
  • Email
Clough bags Waitsia Stage 2 EPC job
Indicative image of proposed Waitsia Gas Plant (Courtesy of Mitsui E&P Australia)

Perth-based engineer Clough has bagged the engineering, procurement and construction (EPC) for the Waitsia Stage 2 development.

The project is being developed by Mitsui E&p Australia and Beach Energy, in the northern Perth Basin, near the town of Dongara approximately 350km north of Perth and 65km south of Geraldton in Western Australia.

Related Articles

Clean Fuel

Western Australia: EPA approves NWS LNG backfill project

2 min read

The project JV has recently executed a fully-termed gas processing agreement (GPA) with the Woodside-led North West Shelf (NWS) project.

Under the agreement, NWS will provide gas processing services for gas from the onshore Waitsia Gas Project Stage 2 for an aggregate of approximately 7.5 million tonnes of LNG in the period between the second half of 2023 and the end of 2028.

Peter Bennett , Clough CEO and managing director said, “Clough and the Waitsia Joint Venture (Mitsui E&P Australia and Beach Energy) have been working together to optimize the design of the Waitsia Stage 2 project in terms of plant operability, capital costs and ongoing sustainability in operations. “

The Waitsia gas field is ranked as one of the largest gas fields ever discovered onshore in Australia.

The Waitsia Stage 2 project includes a new 250 TJ/day gas processing plant with a 20-year life-cycle that will convey gas via the nearby Dampier to Bunbury Natural Gas Pipeline.

Reach the Offshore Energy industry in one go!

Offshore Energy is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow Offshore Energy on:

Filed under

Clean FuelLNGBusiness Developments & ProjectsProject & Tenders

Daily Offshore Energy News in Your Mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1$50 billion South Korean investment pushes stalled Alaska LNG project closer to construction
  2. 2TGS on 3D imaging mission to unlock new insights into Malaysia's offshore discovery
  3. 3Petrobras strikes another oil-bearing zone in Equatorial Margin frontier
  4. 4MidOcean gets hold of $4 billion in major capital raise to fuel global LNG push

Daily Offshore Energy News in Your Mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free