Offshore Energy
  • Fossil Energy
  • Subsea
  • Alternative Fuels
  • Hydrogen
  • Marine Energy
  • More news
JobsNewsletter
Offshore Energy logo

Your trusted source for global offshore energy news, part of the Navingo network.

Topics
  • Fossil Energy
  • Subsea
  • Alternative Fuels
  • Hydrogen
  • Marine Energy
Network
  • Offshore Energy
  • Offshore Wind
  • NavalToday
  • Dredging Today
Company
  • Advertising
  • Newsletter
  • Jobs
  • Report your news
  • Privacy

© 2026 Navingo. All rights reserved.

Home›Clean Fuel›Wärtsilä to build CO2-neutral bio-LNG plant in Germany
Clean Fuel

October 8, 2020 · about 6 years ago

Wärtsilä to build CO2-neutral bio-LNG plant in Germany

The Finnish technology group Wärtsilä has been contracted to supply and build a plant for the production of CO2-neutral liquid transport fuels.

2 minutes read
  • LinkedIn
  • X
  • Email
Wärtsilä to build CO2-neutral bio-LNG plant in Germany
Courtesy of Wärtsilä

The Finnish technology group Wärtsilä has been contracted to supply and build a plant for the production of CO2-neutral liquid transport fuels.

The plant will liquefy gas from the natural gas grid to produce carbon-neutral LNG. It will have a capacity of approximately 100,000 tons per year and will be located in Cologne, Germany, Wärtsilä said in its statement.

“The use of LNG as an emissions-reducing fuel in the marine and transportation industries is already well established, and to introduce bioLNG which can be mixed with LNG is the next obvious step in enabling a CO2-neutral transportation fuel,” said Antti Kuokkanen , VP Gas Solutions.

The feedstock for bioLNG is based on biological waste material e.g. liquid manure and food waste. The feedstock is fed to an anaerobic digestion reactor that produces biogas, which is then upgraded to biomethane and injected into the natural gas grid.

Green gas certificates are issued along with the injected biomethane, which then permits operators at other locations, such as liquefaction plants producing bioLNG, to buy the certificates and utilize the biomethane.

The Wärtsilä scope for this project includes the engineering, the civil works, installation, and commissioning of the plant. The plant will include a gas treatment system based on Wärtsilä’s Puregas CA technology, a liquefaction unit utilizing Wärtsilä’s Semi-Dual Brayton technology, storage tanks, truck filling stations, and all necessary safety flare and auxiliary equipment.

The plant is expected to be fully operational by autumn 2022, Wärtsilä said.

Reach the Offshore Energy industry in one go!

Offshore Energy is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow Offshore Energy on:

Filed under

Clean FuelLNGBusiness Developments & ProjectsProject & Tenders

Daily Offshore Energy News in Your Mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1$50 billion South Korean investment pushes stalled Alaska LNG project closer to construction
  2. 2TGS on 3D imaging mission to unlock new insights into Malaysia's offshore discovery
  3. 3Petrobras strikes another oil-bearing zone in Equatorial Margin frontier
  4. 4MidOcean gets hold of $4 billion in major capital raise to fuel global LNG push

Daily Offshore Energy News in Your Mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free