Offshore Energy
  • Fossil Energy
  • Subsea
  • Alternative Fuels
  • Hydrogen
  • Marine Energy
  • More news
JobsNewsletter
Offshore Energy logo

Your trusted source for global offshore energy news, part of the Navingo network.

Topics
  • Fossil Energy
  • Subsea
  • Alternative Fuels
  • Hydrogen
  • Marine Energy
Network
  • Offshore Energy
  • Offshore Wind
  • NavalToday
  • Dredging Today
Company
  • Advertising
  • Newsletter
  • Jobs
  • Report your news
  • Privacy

© 2026 Navingo. All rights reserved.

Home›Shipbuilding›Norway: GMC Yard Carries Out Modification on AMC Connector
Shipbuilding

February 21, 2012 · about 14 years ago

Norway: GMC Yard Carries Out Modification on AMC Connector

The AMC Connector is known as the largest and most advanced cable- and pipe-laying vessel for deep ocean operations. The vessel will be docked at GMC Yard in Buøy outside Stavanger until March 11th 2012. The 156-meter long multi-purpose vessel, AMC Connector, is an advanced ship with a high cargo ca

1 minutes read
  • LinkedIn
  • X
  • Email

The AMC Connector is known as the largest and most advanced cable- and pipe-laying vessel for deep ocean operations. The vessel will be docked at GMC Yard in Buøy outside Stavanger until March 11th 2012.

The 156-meter long multi-purpose vessel, AMC Connector, is an advanced ship with a high cargo capacity, a variety of special equipment and more than 190 kilometres of cable length. GMC Yard has been commissioned for modifying the ballast tanks and building sponsoons under the hull. Work to be carried out includes adding a new auxiliary keel, installing a new stabilising tank and a new VLS tower on the vessel.

“ The job is shared between GMC Yard, STX in Florø and the ship owner, Aker Marine Contractors. All already have workers on site for the stay in Buøy, ” says Operations Manager Kjell Olsen of GMC Yard . A total of 200 people are engaged in modifying the AMC Connector in this period.

GMC Yard has docking capacity for vessels up to 280 meters, and the AMC Connector has no problem fitting into the large Dock 2 at Buøy. The vessel will be used for laying the power cable from land to the Goliath-field in the Barents Sea.

[mappress]

World Maritime News Staff, February 21, 2012; Image: GMC Yard

Reach the Offshore Energy industry in one go!

Offshore Energy is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow Offshore Energy on:

Filed under

ShipbuildingBusiness & Finance

Daily Offshore Energy News in Your Mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1$50 billion South Korean investment pushes stalled Alaska LNG project closer to construction
  2. 2TGS on 3D imaging mission to unlock new insights into Malaysia's offshore discovery
  3. 3Petrobras strikes another oil-bearing zone in Equatorial Margin frontier
  4. 4MidOcean gets hold of $4 billion in major capital raise to fuel global LNG push

Daily Offshore Energy News in Your Mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free