Offshore Energy
  • Fossil Energy
  • Subsea
  • Alternative Fuels
  • Hydrogen
  • Marine Energy
  • More news
JobsNewsletter
Offshore Energy logo

Your trusted source for global offshore energy news, part of the Navingo network.

Topics
  • Fossil Energy
  • Subsea
  • Alternative Fuels
  • Hydrogen
  • Marine Energy
Network
  • Offshore Energy
  • Offshore Wind
  • NavalToday
  • Dredging Today
Company
  • Advertising
  • Newsletter
  • Jobs
  • Report your news
  • Privacy

© 2026 Navingo. All rights reserved.

Home›Shipbuilding›Japan: Tsuneishi Shipyard Launches New Kamsarmax Ship for NYK Bulkship
Shipbuilding

January 20, 2012 · about 14 years ago

Japan: Tsuneishi Shipyard Launches New Kamsarmax Ship for NYK Bulkship

Fukuyama Tsuneishi Shipyard of Tsuneishi Shipbuilding Co. has launched today, on January 20th, a 82.000 DWT KAMSARMAX type bulk carrier for the NYK Bulkship (ATLANTIC) NV. This ship is a KAMSARMAX bulk carrier, developed by the shipyard, as one of its major products alongside the TESS series. The na

1 minutes read
  • LinkedIn
  • X
  • Email

Fukuyama Tsuneishi Shipyard of Tsuneishi Shipbuilding Co. has launched today, on January 20th, a 82.000 DWT KAMSARMAX type bulk carrier for the NYK Bulkship (ATLANTIC) NV.

This ship is a KAMSARMAX bulk carrier, developed by the shipyard, as one of its major products alongside the TESS series. The name “KAMSARMAX” derives from the ship’s length, which is the maximum possible for entry into the port of Kamsar in Guinea, West Africa. Kamsar is one of the world’s principal ports for bauxite.

The ship has 7 cargo holds, with side-rolling type hatch covers for each. In addition, cargo hold hatchways are built at maximum width to improve the efficiency of loading and unloading. Grain crops, coal, and iron ore can all be loaded onto the ship. High density material such as iron ore can be loaded into alternating cargo holds, such as No.1, No.3, No.5, and No.7. the vessel is powered by MAN-B&W 6S60MC-C main engine with the service speed of 14.5 knots. Additionally, the ship is equipped with MT-FAST, which is designed to conserve energy, at the ship’s tail. The fuel tank is equipped with a double-hull in consideration of environmental concerns.

Delivery of the vessel is scheduled for Early March, 2012.

[mappress] World Maritime News Staff, January 20, 2012; Image: Tsuneishi

Reach the Offshore Energy industry in one go!

Offshore Energy is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow Offshore Energy on:

Filed under

ShipbuildingBusiness & Finance

Daily Offshore Energy News in Your Mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1$50 billion South Korean investment pushes stalled Alaska LNG project closer to construction
  2. 2TGS on 3D imaging mission to unlock new insights into Malaysia's offshore discovery
  3. 3Petrobras strikes another oil-bearing zone in Equatorial Margin frontier
  4. 4MidOcean gets hold of $4 billion in major capital raise to fuel global LNG push

Daily Offshore Energy News in Your Mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free