Offshore Energy
  • Fossil Energy
  • Subsea
  • Alternative Fuels
  • Hydrogen
  • Marine Energy
  • More news
JobsNewsletter
Offshore Energy logo

Your trusted source for global offshore energy news, part of the Navingo network.

Topics
  • Fossil Energy
  • Subsea
  • Alternative Fuels
  • Hydrogen
  • Marine Energy
Network
  • Offshore Energy
  • Offshore Wind
  • NavalToday
  • Dredging Today
Company
  • Advertising
  • Newsletter
  • Jobs
  • Report your news
  • Privacy

© 2026 Navingo. All rights reserved.

Home›Clean Fuel›Wison kicks off topsides fabrication for Eni’s Congo FLNG unit
Clean Fuel

July 4, 2023 · about 3 years ago

Wison kicks off topsides fabrication for Eni’s Congo FLNG unit

Chinese shipyard Wison Heavy Industry, a subsidiary of Wison Offshore & Marine Limited (WOM), has started the fabrication of topsides as a new milestone in the construction of Eni’s Congo-bound floating LNG (FLNG) unit. The start of topsides fabrication was marked with a steel-cutting ceremony held

2 minutes read
  • LinkedIn
  • X
  • Email
Wison kicks off topsides fabrication for Eni’s Congo FLNG unit
Courtesy of Wison Offshore & Marine

Chinese shipyard Wison Heavy Industry, a subsidiary of Wison Offshore & Marine Limited (WOM), has started the fabrication of topsides as a new milestone in the construction of Eni’s Congo-bound floating LNG (FLNG) unit.

The start of topsides fabrication was marked with a steel-cutting ceremony held on 3 July at the Zhoushan yard in China with more than 200 people attending the ceremony.

At the end of 2022, Eni contracted the Chinese shipyard for the construction of the 2.4 million tonnes per annum (mtpa) FLNG unit to be deployed offshore the Republic of Congo to increase production and export.

The official construction of the unit began on 17 January 2023 and is advancing according to the plan with the fabrication of storage tanks and the hull underway.

The 380-metre-long and 60-metre-wide FLNG unit will be anchored at a water depth of around 40 metres in the Nene Marine Field area, around 50 kilometres offshore Pointe Noire. It will be able to store over 180,000 cubic metres of LNG and 45,000 cubic metres of LPG.

READ MORE Construction of Eni’s second Congo-bound FLNG unit gains ground Wison starts building Eni’s 2nd Congo-bound FLNG unit This will be the second FLNG facility to be deployed in Congo – the first one being Tango FLNG of 0.6 mtpa capacity – with LNG production expected to begin in 2023.

Both projects are part of the Marine XII gas valorisation plan, in line with Eni’s strategy to leverage gas equity.

With the second project, the overall LNG production capacity on Marine XII will reach 3 million tons/year (over 4.5 billion cubic metres/year) in 2025.

Follow us:

Reach the Offshore Energy industry in one go!

Offshore Energy is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow Offshore Energy on:

Filed under

Clean FuelLNGBusiness Developments & ProjectsInfrastructureVessels

Daily Offshore Energy News in Your Mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1Dutch LNG terminal capacity rises to 20 billion cubic meters with 4th tank
  2. 2EnerMech stays with Chevron in Australia until end of 2031
  3. 3Centrica secures two-decade-long LNG supply from Canadian project
  4. 4Digital twin technology to help improve safety of ammonia-fueled vessels

Daily Offshore Energy News in Your Mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free