Offshore Energy
  • Fossil Energy
  • Subsea
  • Alternative Fuels
  • Hydrogen
  • Marine Energy
  • More news
JobsNewsletter
Offshore Energy logo

Your trusted source for global offshore energy news, part of the Navingo network.

Topics
  • Fossil Energy
  • Subsea
  • Alternative Fuels
  • Hydrogen
  • Marine Energy
Network
  • Offshore Energy
  • Offshore Wind
  • NavalToday
  • Dredging Today
Company
  • Advertising
  • Newsletter
  • Jobs
  • Report your news
  • Privacy

© 2026 Navingo. All rights reserved.

Home›Clean Fuel›KNOT orders new shuttle tanker for charter with Petrobras
Clean Fuel

November 24, 2022 · about 3 years ago

KNOT orders new shuttle tanker for charter with Petrobras

Norway-based shuttle tankers owner and operator Knutsen NYK Offshore Tankers AS (KNOT) has ordered another shuttle tanker for time charter with Brazilian oil and gas giant Petrobras. On 21 November, KNOT signed a contract with Chinese shipyard Cosco Shipping Heavy Industry (Zhoushan) for the constru

2 minutes read
  • LinkedIn
  • X
  • Email
KNOT orders new shuttle tanker for charter with Petrobras
Courtesy of Knutsen Group

Norway-based shuttle tankers owner and operator Knutsen NYK Offshore Tankers AS (KNOT) has ordered another shuttle tanker for time charter with Brazilian oil and gas giant Petrobras .

On 21 November, KNOT signed a contract with Chinese shipyard Cosco Shipping Heavy Industry (Zhoushan) for the construction of a 154,000 cbm Suezmax dynamic positioning (DP2) shuttle tanker.

The newly ordered vessel will be delivered in 2025, KNOT informed. Then, the vessel will start operating under a 15-year-long time charter agreement with Petrobras .

KNOT has also another shuttle tanker for a 10-year charter with Petrobras, scheduled for delivery in October 2024.

With the latest order, Knutsen Group will have a total of 26 new builds under construction, both liquefied natural gas (LNG) and shuttle tankers.

Meanwhile, Petrobras welcomed three Suezmax DP2 shuttle tankers that were chartered from AET, a Singapore-based petroleum logistics unit of Malaysia’s MISC Berhad.

The first of these vessels, Eagle Colatina, built for Petrobras charter was named in March 2022 . Samsung Heavy Industries (SHI) handed over the second one, Eagle Cambe, on 31 May 2022.

The third, and final tanker – Eagle Crato – was named and delivered at the end of July this year.

Related Articles

Fossil Energy

AET’s new shuttle tanker ready to work for Petrobras

3 min read

The vessels were built to Petrobras’ technical requirements in Brazil and will operate to the “highest operational and environmental standards,” including full compliance with IMO NOx Tier 3 and SOx emission requirements.

They are classed with ABS and equipped with electrical-driven variable frequency drive cargo pumps and high-power thrusters for enhanced fuel efficiency.

Reach the Offshore Energy industry in one go!

Offshore Energy is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow Offshore Energy on:

Filed under

Clean FuelFossil EnergyGreen MarineShipbuildingBusiness Developments & ProjectsVessels

Daily Offshore Energy News in Your Mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1Electrical fault triggers oil output deferral and rig intervention plans at Karoon’s Brazilian field
  2. 2TotalEnergies’ Caspian Sea gas and condensate field expansion is a go
  3. 3TotalEnergies earmarks annual spend of up to $17 billion over next five years
  4. 4Fugro performs ultra-deepwater AUV survey off East Malaysia

Daily Offshore Energy News in Your Mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free