Offshore Energy
  • Fossil Energy
  • Subsea
  • Alternative Fuels
  • Hydrogen
  • Marine Energy
  • More news
JobsNewsletter
Offshore Energy logo

Your trusted source for global offshore energy news, part of the Navingo network.

Topics
  • Fossil Energy
  • Subsea
  • Alternative Fuels
  • Hydrogen
  • Marine Energy
Network
  • Offshore Energy
  • Offshore Wind
  • NavalToday
  • Dredging Today
Company
  • Advertising
  • Newsletter
  • Jobs
  • Report your news
  • Privacy

© 2026 Navingo. All rights reserved.

Home›Clean Fuel›McDermott to build Scarborough floating production unit for Woodside
Clean Fuel

January 10, 2022 · about 4 years ago

McDermott to build Scarborough floating production unit for Woodside

McDermott International has been awarded a contract by Woodside for the EPCIC services for its floating production unit off Australia.

2 minutes read
  • LinkedIn
  • X
  • Email
Rendering of the Scarborough FPU - Woodside - McDermott
Rendering of the Scarborough FPU; Source: Woodside

McDermott International has been awarded a contract by Woodside, as the operator for and on behalf of the Scarborough Joint Venture, for the engineering, procurement, construction, installation and commissioning (EPCIC) services for its floating production unit (FPU) offshore Western Australia.

The award follows the successful completion of the Front-End Engineering Design (FEED) for the Scarborough project, which was awarded to McDermott back in February 2019.

The integrated scope for this latest contract also includes the design, fabrication, integration, transportation and installation of the hull and topsides, McDermott revealed on Monday.

The topside, which will be approximately 30,000 tons, will be fabricated by McDermott’s joint venture fabrication yard, Qingdao McDermott Wuchuan , in China. The project scope includes a battery energy storage system to reduce emissions on the topsides and support Woodside’s net emissions reduction targets.

“McDermott brings the engineering and execution expertise to deliver integrated deepwater subsea projects and offshore FPUs to the highest standards,” s aid Samik Mukherjee , Executive Vice President and Chief Operating Officer.

He added: “After a long engagement on the project, the collaborative execution model with Woodside—from pre-FEED through to EPCIC—de-risks execution. Further, the facilities incorporate energy efficiency in design to reduce Scarborough’s offshore emissions.”

Engineering expertise will be leveraged from McDermott’s Kuala Lumpur and Gurgaon offices, with the company’s subsea team in Perth supporting transport, installation, hook up and commissioning activities.

The FPU processes natural gas, which includes gas separation, dehydration and compression as well as mono ethylene glycol regeneration and produced-water handling. Designed for a production capacity of up to 1.8 billion standard cubic feet per day, the topside will be connected to the semi-submersible hull and pre-commissioned prior to transportation and installation in a water depth of 3,100 feet (950 meters), approximately 248 miles (400 kilometres) offshore Western Australia.

McDermott noted that the FPU will be capable of being remotely operated and minimally staffed during normal production operations.

Related Articles

Clean Fuel

Woodside moves ahead with BHP merger, sanctions $12 bln Scarborough project

5 min read

The Scarborough Joint Venture comprises Woodside (73.5 per cent) and BHP Petroleum (Australia) (26.5 per cent). Woodside and BHP announced on 22 November 2021 that a final investment decision has been made by the Scarborough Joint Venture to proceed with the Scarborough Project.

Reach the Offshore Energy industry in one go!

Offshore Energy is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow Offshore Energy on:

Filed under

Clean FuelFossil EnergyLNGOil & GasSubseaBusiness & FinanceBusiness Developments & ProjectsExploration & ProductionProject & TendersVessels

Daily Offshore Energy News in Your Mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1Electrical fault triggers oil output deferral and rig intervention plans at Karoon’s Brazilian field
  2. 2TotalEnergies’ Caspian Sea gas and condensate field expansion is a go
  3. 3TotalEnergies earmarks annual spend of up to $17 billion over next five years
  4. 4Fugro performs ultra-deepwater AUV survey off East Malaysia

Daily Offshore Energy News in Your Mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free