Offshore Energy
  • Fossil Energy
  • Subsea
  • Alternative Fuels
  • Hydrogen
  • Marine Energy
  • More news
JobsNewsletter
Offshore Energy logo

Your trusted source for global offshore energy news, part of the Navingo network.

Topics
  • Fossil Energy
  • Subsea
  • Alternative Fuels
  • Hydrogen
  • Marine Energy
Network
  • Offshore Energy
  • Offshore Wind
  • NavalToday
  • Dredging Today
Company
  • Advertising
  • Newsletter
  • Jobs
  • Report your news
  • Privacy

© 2026 Navingo. All rights reserved.

Home›Clean Fuel›Wärtsilä tech picked for Arctic LNG 2 carriers
Clean Fuel

April 19, 2021 · about 5 years ago

Wärtsilä tech picked for Arctic LNG 2 carriers

The Finnish technology group Wärtsilä said it has inked a deal to deliver radio and integrated navigation systems tech for ten icebreaking LNG-fueled tankers to be constructed for the Arctic LNG-2 project.

2 minutes read
  • LinkedIn
  • X
  • Email
Wärtsilä tech picked for Arctic LNG 2 carriers
Courtesy of Wärtsilä

The Finnish technology group Wärtsilä said it has inked a deal to deliver radio and integrated navigation systems tech for ten icebreaking LNG-fueled tankers to be constructed for the Arctic LNG-2 project.

The order was placed in January 2021 with Wärtsilä Voyage, and is now in process of execution, in partnership with Samsung Heavy Industries.

The new contract is an extension of the announcement made last summer, where Wärtsilä Voyage equipped five LNG carriers with integrated bridge systems under the same project.

The vessels will operate between the Yamal Peninsula in northwest Siberia, Russia and the main European Union ports. The crew is expected to face some of the most challenging weather conditions.

“We will, therefore, be placing two bridges in the vessels’ superstructure, with one of them turned 180 degrees from the conventional position. This peculiar design will allow icebreakers to move both forward and aft, thus ensuring safe navigation under adverse Arctic climate conditions,” said Alex Van Knotsenborg , director global sales, Wärtsilä Voyage.

The contract includes the installation of a multifunction display system consisting of 12 workstations with a full set of applications, including an Electronic Chart Display and Information System (ECDIS), radar, conning navigation information display system, Bridge Alert Management System (BAMS), and Wärtsilä Navi-Planner for advanced route planning.

The scope of Wärtsilä solutions also includes IRIDIUM satellite communication systems. The workstations are fully integrated into a unified system, which allows the main operational functions to be duplicated, thereby improving the safety of ice navigation.

All the equipment installed onboard is fully compliant with the requirements of the Russian Maritime Register of Shipping (RS) and Bureau Veritas (BV).

It is designed and tested to operate all year round in heavy Arctic conditions at temperatures down to 52°C below zero.

The installation of the equipment is scheduled for 2022-2024.

The Arctic LNG-2 project is dedicated to the production, storage and shipment of liquefied natural gas (LNG) and gas condensate from the Salmanovsky gas field of the Gydan Peninsula.

The project involves the construction of three LNG production lines with a capacity of 6.6 million tons per year, as well as stable gas condensate. The total capacity of three lines is projected to be 19.8 million tons of LNG per year.

Reach the Offshore Energy industry in one go!

Offshore Energy is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow Offshore Energy on:

Filed under

Clean FuelGreen MarineLNGBusiness Developments & ProjectsProject & Tenders

Daily Offshore Energy News in Your Mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1Eni gets the ball rolling on execution of Mediterranean gas project
  2. 2Reach Subsea and Eidesvik's 2009-built IMR vessel delivered to new owners
  3. 3Tight reservoirs on Equinor and Aker BP’s agenda amid Norway’s 2.8-billion-boe potential
  4. 4AI solutions to track wildlife at Welsh 30 MW tidal energy project

Daily Offshore Energy News in Your Mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free