Offshore Energy
  • Fossil Energy
  • Subsea
  • Alternative Fuels
  • Hydrogen
  • Marine Energy
  • More news
JobsNewsletter
Offshore Energy logo

Your trusted source for global offshore energy news, part of the Navingo network.

Topics
  • Fossil Energy
  • Subsea
  • Alternative Fuels
  • Hydrogen
  • Marine Energy
Network
  • Offshore Energy
  • Offshore Wind
  • NavalToday
  • Dredging Today
Company
  • Advertising
  • Newsletter
  • Jobs
  • Report your news
  • Privacy

© 2026 Navingo. All rights reserved.

Home›Dredging›A&P Tees Extending the Life of TSHD Heortnesse
Dredging

January 17, 2020 · about 6 years ago

A&P Tees Extending the Life of TSHD Heortnesse

The team at A&P Tees is currently extending the life of the trailing suction hopper dredger Heortnesse, which maintains the navigable depth in the ports of Tees and Hartlepool, by up to 17 years. According to the A&P, the work is being carried out over two dockings – the first of which was completed

2 minutes read
  • LinkedIn
  • X
  • Email
A&P Tees Extending the Life of TSHD Heortnesse
Image source: A&P Tees

The team at A&P Tees is currently extending the life of the trailing suction hopper dredger Heortnesse, which maintains the navigable depth in the ports of Tees and Hartlepool, by up to 17 years.

According to the A&P, the work is being carried out over two dockings – the first of which was completed two weeks ahead of schedule in October. The second will take place early this year.

Following detailed analysis of the dredger’s structure and systems, it was concluded that renewal and refurbishment works would allow the vessel to continue its duties in an effective and resilient manner for in excess of 15 years, the company reported.

A&P Tees began the fabrication and preparation works well in advance of the 40-year old dredger’s arrival in dock to ensure the quick turnaround required by the client, PD Ports.

The program of works included changing the propulsion drives to allow the vessel to operate on two generators instead of the three currently required. This will provide significant long-term gain in relation to fuel consumption and the subsequent environmental benefits.

In total 30t of steel was renewed including coaming shells, cross bracings, pipework and platforms. The deck-dredge hydraulics and control systems, as well as the alarm and communications systems were also renewed.

The dredge system was also refurbished with a new dredge pump, dredge pipework, densitometer and dredge monitoring system installed. The bottom doors, including rams and linkages, and accommodation spaces were also refurbished and some external coatings repainted.

Reach the Offshore Energy industry in one go!

Offshore Energy is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow Offshore Energy on:

Filed under

DredgingBusiness & FinanceVessels

Daily Offshore Energy News in Your Mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1$50 billion South Korean investment pushes stalled Alaska LNG project closer to construction
  2. 2TGS on 3D imaging mission to unlock new insights into Malaysia's offshore discovery
  3. 3Petrobras strikes another oil-bearing zone in Equatorial Margin frontier
  4. 4MidOcean gets hold of $4 billion in major capital raise to fuel global LNG push

Daily Offshore Energy News in Your Mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free