Offshore Energy
  • Fossil Energy
  • Subsea
  • Alternative Fuels
  • Hydrogen
  • Marine Energy
  • More news
JobsNewsletter
Offshore Energy logo

Your trusted source for global offshore energy news, part of the Navingo network.

Topics
  • Fossil Energy
  • Subsea
  • Alternative Fuels
  • Hydrogen
  • Marine Energy
Network
  • Offshore Energy
  • Offshore Wind
  • NavalToday
  • Dredging Today
Company
  • Advertising
  • Newsletter
  • Jobs
  • Report your news
  • Privacy

© 2026 Navingo. All rights reserved.

Home›Offshore Wind›Global Marine Group Orders New Osbit Plough
Offshore Wind

February 28, 2019 · about 7 years ago

Global Marine Group Orders New Osbit Plough

Offshore technology and engineering company Osbit Limited has secured a contract with Global Marine Group to supply a multi-function pre-lay and backfill subsea plough – Scion 240. The Scion 240 plough is being designed and built in North-East England and will be delivered from Osbit’s Blyth works a

2 minutes read
  • LinkedIn
  • X
  • Email

Offshore technology and engineering company Osbit Limited has secured a contract with Global Marine Group to supply a multi-function pre-lay and backfill subsea plough – Scion 240.

The Scion 240 plough is being designed and built in North-East England and will be delivered from Osbit’s Blyth works at the end of May 2019. Osbit will support Global Marine Group and their customer with sea trials and be available to assist Scion 240 as it commences work on its first project later in the summer.

The Scion 240 is said to reduce the cost of offshore wind by minimising the operational risk and the time required to install subsea cables.

According to Osbit, the system delivers boulder clearance and pre-trenching up to 1.7m in a single run, leaving a boulder cleared swathe and a ‘backfill-ready’ open trench with segregated spoil.

Martyn Drye , Director of Engineering at Global Marine Group, said: “The Scion 240 Plough is an exciting new subsea tool for our business; offering boulder clearance and pre-trenching in a single pass is an industry-first. Our team of in-house engineers, working closely with Osbit, developed this solution, which delivers not only for our significant inaugural project, but also for the long-term, meeting the needs of our customers in multiple sectors. We’re excited to receive the Plough in Q2, 2019, and begin work towards the summer, later this year.”

The system is said to be fully subsea adjustable and features a surveillance suite for accurate route tracking and effective trenching. This functionality is provided through Osbit’s control technology which consists of an open source modular system incorporating Osbit Integrated Logistics Support (OILS) asset monitoring, packaged in an ergonomic control cabin.

The Scion 240 can also be reconfigured into backfill mode, which uses the same control and surveillance suite to monitor the cable and trench profile.

Osbit Director Robbie Blakeman said: “This project is a great case study showcasing our unique working practices. We collaborated with the Global Marine Group team and its customer to develop an appropriately engineered solution that is both operationally and commercially effective. Our team is also working closely with our fantastic supply chain, which is predominantly based in the North East.”

Reach the Offshore Energy industry in one go!

Offshore Energy is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow Offshore Energy on:

Filed under

Offshore WindTechnology

Daily Offshore Energy News in Your Mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1Former IMR ship strengthens Asso.subsea's fleet as trenching support vessel
  2. 2Dolphin Drilling parts ways with 52-year-old rig and forges pact with SPM
  3. 3Fugro's 18-meter USV on survey duty at 'world's longest interconnector'
  4. 4Energy Drilling lines up 30-month job to keep its rig busy through 2030

Daily Offshore Energy News in Your Mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free