Offshore Energy
  • Fossil Energy
  • Subsea
  • Alternative Fuels
  • Hydrogen
  • Marine Energy
  • More news
JobsNewsletter
Offshore Energy logo

Your trusted source for global offshore energy news, part of the Navingo network.

Topics
  • Fossil Energy
  • Subsea
  • Alternative Fuels
  • Hydrogen
  • Marine Energy
Network
  • Offshore Energy
  • Offshore Wind
  • NavalToday
  • Dredging Today
Company
  • Advertising
  • Newsletter
  • Jobs
  • Report your news
  • Privacy

© 2026 Navingo. All rights reserved.

Home›Shipbuilding›Russia’s Demand for Nuclear-Powered Icebreakers to Be Determined
Shipbuilding

August 8, 2017 · about 9 years ago

Russia’s Demand for Nuclear-Powered Icebreakers to Be Determined

The Center for Strategic Development will evaluate Russia’s demand for next-generation super-heavy nuclear-powered icebreakers for the purposes of freight transportation along the Northern Sea Route (NSR), The Arctic said. The survey has been ordered by Atomflot (Rosatom Flot), a company owned by th

1 minutes read
  • LinkedIn
  • X
  • Email

The Center for Strategic Development will evaluate Russia’s demand for next-generation super-heavy nuclear-powered icebreakers for the purposes of freight transportation along the Northern Sea Route (NSR), The Arctic said .

The survey has been ordered by Atomflot (Rosatom Flot), a company owned by the Rosatom State Corporation. The center will also develop a financial and economic model for the construction and operations of the icebreakers, RIA Novosti reported.

As informed, the center will have to determine the demand and evaluate the socioeconomic and budget effects of the construction and operation of two 10510 Lider new-generation icebreakers for marine freight transportation through the Russian Arctic.

This includes evaluating the current and potential (by 2030) volume of the freight transported via the NSR and other key competing routes.

The newbuildings would be equipped with nuclear-powered steam generating systems consisting of two 315 MW reactors.

The ships are expected to ensure year-round navigation on NSR and expeditions to the Arctic.

The first Project 10510 icebreaker may be built by 2030, according to The Arctic.

Reach the Offshore Energy industry in one go!

Offshore Energy is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow Offshore Energy on:

Filed under

ShipbuildingNews

Daily Offshore Energy News in Your Mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1Yinson Production, PTSC cheer FSO’s first oil at Southeast Asian project
  2. 2DOF opts to sell 2018-built subsea vessel as attractive offer emerges
  3. 3Natural gas discovery springs up in India’s shallow waters
  4. 4Prysmian's 193-meter CLV Alessandro Volta performing sea trials

Daily Offshore Energy News in Your Mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free