Offshore Energy
  • Fossil Energy
  • Subsea
  • Alternative Fuels
  • Hydrogen
  • Marine Energy
  • More news
JobsNewsletter
Offshore Energy logo

Your trusted source for global offshore energy news, part of the Navingo network.

Topics
  • Fossil Energy
  • Subsea
  • Alternative Fuels
  • Hydrogen
  • Marine Energy
Network
  • Offshore Energy
  • Offshore Wind
  • NavalToday
  • Dredging Today
Company
  • Advertising
  • Newsletter
  • Jobs
  • Report your news
  • Privacy

© 2026 Navingo. All rights reserved.

Home›Marine Energy›NEMOS orders MacGregor winches for wave energy system
Marine Energy

June 2, 2016 · about 10 years ago

NEMOS orders MacGregor winches for wave energy system

German-based wave energy developer NEMOS has hired marine engineering firm MacGregor, part of Cargotec, to supply winches for its pilot wave energy system.

1 minutes read
  • LinkedIn
  • X
  • Email

German-based wave energy developer NEMOS has hired marine engineering firm MacGregor, part of Cargotec, to supply winches for its pilot wave energy system.

NEMOS’ wave energy system is suitable for use in combination with offshore wind farms, by using the same tower and electrical infrastrucutre, which lowers the levelised cost of energy (LCOE) and evens the fluctuations in power generation – therefore supporting greater commercial viability of renewable energy capture.

The wave energy system uses specially-shaped floating structures that move in a controlled trajectory to capture up to 80% of available wave energy, with the mooring system that employs two fibre ropes for each approximately 20 m long floater.

The ropes are controlled by the MacGregor winches that optimize the movement to maximize energy capture, which can also be used to adjust the orientation of the floating structures, as well as for protection against storms by hauling the floaters under water, according to MacGregor.

Marcus Wolter , Strategy and Business Development Director at MacGregor, said: “Over the coming years, a large number of offshore wind farms will be built, and within these farms there is a considerable wave energy potential. Shared infrastructure, such as subsea cables and substations, could be better utilised, therefore the pro rata costs for energy transport would also decrease.”

The first commercial NEMOS pilot project will be located in the North Sea and it should be fully operational during 2017, MacGregor informed.

Reach the Offshore Energy industry in one go!

Offshore Energy is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow Offshore Energy on:

Filed under

Marine EnergyBusiness & FinanceResearch & DevelopmentTechnology

Daily Offshore Energy News in Your Mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1$50 billion South Korean investment pushes stalled Alaska LNG project closer to construction
  2. 2TGS on 3D imaging mission to unlock new insights into Malaysia's offshore discovery
  3. 3Petrobras strikes another oil-bearing zone in Equatorial Margin frontier
  4. 4MidOcean gets hold of $4 billion in major capital raise to fuel global LNG push

Daily Offshore Energy News in Your Mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free