Offshore Energy
  • Fossil Energy
  • Subsea
  • Alternative Fuels
  • Hydrogen
  • Marine Energy
  • More news
JobsNewsletter
Offshore Energy logo

Your trusted source for global offshore energy news, part of the Navingo network.

Topics
  • Fossil Energy
  • Subsea
  • Alternative Fuels
  • Hydrogen
  • Marine Energy
Network
  • Offshore Energy
  • Offshore Wind
  • NavalToday
  • Dredging Today
Company
  • Advertising
  • Newsletter
  • Jobs
  • Report your news
  • Privacy

© 2026 Navingo. All rights reserved.

Home›Marine Energy›WaveRoller ready for operation
Marine Energy

March 30, 2016 · about 10 years ago

WaveRoller ready for operation

The power take-off system (PTO) of AW-Energy’s WaveRoller wave energy device has passed the 6-month inspection with flying colors.

2 minutes read
  • LinkedIn
  • X
  • Email

The power take-off system (PTO) of AW-Energy’s WaveRoller wave energy device has passed the 6-month inspection with flying colors, the company informed.

Following the conclusion of the trials, conducted at AW-Energy’s PTO testing facility in Järvenpää, Finland, the device was shut down in mid-February for the first scheduled inspection.

The ongoing development work resulted in distribution grid code compliance, achieved at the centre, meaning that the WaveRoller’s electricity meets the strictest utility criteria worldwide, the Finnish-based wave energy developer stated.

During the shutdown, the PTO of the first commercial scale 350 kW WaveRoller, soon to be deployed in Portugal, has been tuned-up to meet the local wave conditions.

Sami Pasanen , Chief Engineer at the WaveRoller test centre in Järvenpää, said: “We’ve reached an important milestone in demonstrating our PTO technology and the team is looking forward to commence the final preparations to finish the PTO for the first-of-a-kind deployment. We now ensure that all parts work seamlessly together and fine-tune the control algorithm to meet the demands for operation in ocean conditions.”

The wave machine at AW-Energy’s PTO facility consists of a giant hydraulic piston that simulates the power of natural waves in the ocean. The full-scale wave machine can be programmed to run any stochastic wave state up to 2 MW. This unit is connected to the PTO of the WaveRoller, a sophisticated hydraulic circuit running an electric generator.

The PTOs of all WaveRollers can thus be fine-tuned on dry land to exactly match the local wave conditions where each WaveRoller device is to be deployed, AW-Energy informed.

In order to follow best practice and garner experience from other industries – a reliability, availability, maintainability and serviceability (RAMS) study is carried out together with experts from VTT -Technical Research Centre of Finland.

A part of the results from the inspections will be used to improve the reliability model and guide decisions, AW-Energy said in a press release.

Reach the Offshore Energy industry in one go!

Offshore Energy is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow Offshore Energy on:

Filed under

Marine EnergyResearch & DevelopmentTechnology

Daily Offshore Energy News in Your Mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1$50 billion South Korean investment pushes stalled Alaska LNG project closer to construction
  2. 2TGS on 3D imaging mission to unlock new insights into Malaysia's offshore discovery
  3. 3Petrobras strikes another oil-bearing zone in Equatorial Margin frontier
  4. 4MidOcean gets hold of $4 billion in major capital raise to fuel global LNG push

Daily Offshore Energy News in Your Mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free