Offshore Energy
  • Fossil Energy
  • Subsea
  • Alternative Fuels
  • Hydrogen
  • Marine Energy
  • More news
JobsNewsletter
Offshore Energy logo

Your trusted source for global offshore energy news, part of the Navingo network.

Topics
  • Fossil Energy
  • Subsea
  • Alternative Fuels
  • Hydrogen
  • Marine Energy
Network
  • Offshore Energy
  • Offshore Wind
  • NavalToday
  • Dredging Today
Company
  • Advertising
  • Newsletter
  • Jobs
  • Report your news
  • Privacy

© 2026 Navingo. All rights reserved.

Home›Shipbuilding›PT SMOE Indonesia to Build Two Wellhead Platforms for Premier Oil
Shipbuilding

June 4, 2012 · about 14 years ago

PT SMOE Indonesia to Build Two Wellhead Platforms for Premier Oil

SMOE Pte Ltd, a wholly-owned subsidiary of Sembcorp Marine, announced that its Indonesian subsidiary, PT SMOE Indonesia, in consortium with PT Rajawali Swiber Cakrawala, has secured a contract worth about US$175 million from Premier Oil Natuna Sea B.V. for the engineering and construction of 2 Wellh

2 minutes read
  • LinkedIn
  • X
  • Email

SMOE Pte Ltd, a wholly-owned subsidiary of Sembcorp Marine, announced that its Indonesian subsidiary, PT SMOE Indonesia, in consortium with PT Rajawali Swiber Cakrawala, has secured a contract worth about US$175 million from Premier Oil Natuna Sea B.V. for the engineering and construction of 2 Wellhead Platforms, 2 infield sub-sea pipelines and modification works on an existing facility for the Naga and Pelikan Project, offshore Indonesia.

The platform topside and jacket each weighs approximately 480 and 900 metric tonnes respectively. The sub-sea pipelines of 14 inch diameter by 19 km and 12 inch diameter by 32 km are tied to the existing Central Processing Platform.

PT SMOE Indonesia’s scope of work, worth about US$63 million, entails engineering design, procurement, construction, offshore hook-up and commissioning of the 2 platforms and modification work on the existing Central Processing Platform, while PT Rajawali Swiber Cakrawala is responsible for the engineering and laying of the 2 sub-sea pipelines as well as the transportation and installation of the 2 platforms in water depth of 82 metres.

Construction work on the platforms is expected to commence in July 2012 with offshore completion by September 2013.

Mr Norman Chew, President Director of PT SMOE Indonesia said “Both PT SMOE and PT Rajawali Swiber Cakrawala recognise each other’s strength and we are glad to have joined forces to secure this contract. This is the second contract award that PT SMOE Indonesia has secured from Premier Oil Natuna Sea B.V.”

The contract is not expected to have any material impact on the net tangible assets and earnings per share of Sembcorp Marine for the year ending December 31, 2012.

[mappress]

Source: Sembcorp Marine, June 4, 2012; Image: Premier Oil

Reach the Offshore Energy industry in one go!

Offshore Energy is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow Offshore Energy on:

Filed under

ShipbuildingBusiness & Finance

Daily Offshore Energy News in Your Mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1Baker Hughes helping chart a course for LNG and monetize Venezuela’s gas reserves
  2. 2Yinson Production and Eni amplifying African FPSO’s gas capacity
  3. 3Sea Lion project on the hunt for new contractors amid Argentine sanction threats
  4. 4Seatrium picks up 9th FSRU conversion job with Karpowership

Daily Offshore Energy News in Your Mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free