Offshore Energy
  • Fossil Energy
  • Subsea
  • Alternative Fuels
  • Hydrogen
  • Marine Energy
  • More news
JobsNewsletter
Offshore Energy logo

Your trusted source for global offshore energy news, part of the Navingo network.

Topics
  • Fossil Energy
  • Subsea
  • Alternative Fuels
  • Hydrogen
  • Marine Energy
Network
  • Offshore Energy
  • Offshore Wind
  • NavalToday
  • Dredging Today
Company
  • Advertising
  • Newsletter
  • Jobs
  • Report your news
  • Privacy

© 2026 Navingo. All rights reserved.

Home›Shipbuilding›Russia: State Commission Accepts Second Tug
Shipbuilding

November 2, 2011 · about 15 years ago

Russia: State Commission Accepts Second Tug

On Oct 21, 2011 state commission accepted the second Project 705B harbor tug RB-10 (serial number 002) built by Astrakhan Ship Repair Plant (affiliate of JSC Zvezdochka). Project 705B was developed by JSC Vympel Design Bureau (Nizhny Novgorod). First ship of this project (serial number 001) harbor t

2 minutes read
  • LinkedIn
  • X
  • Email

On Oct 21, 2011 state commission accepted the second Project 705B harbor tug RB-10 (serial number 002) built by Astrakhan Ship Repair Plant (affiliate of JSC Zvezdochka ).

Project 705B was developed by JSC Vympel Design Bureau (Nizhny Novgorod). First ship of this project (serial number 001) harbor tug RB-39 was launched by Astrakhan shipwrights in Apr 2010. The ship had passed trials in July 2010. On Nov 15 – 288th anniversary of Caspian Flotilla’s foundation – ensign of Russian Navy’s auxiliary fleet was triumphantly hoisted on RB-39 , and the tug joined Caspian Flotilla.

Naval experts, designers and shipbuilders conducted extended joint test of the vessel in summer 2010; in particular, they checked the tug’s towage capability. She proved performance characteristics in full. At present, Astrakhan branch of JSC Zvezdochka Ship Repair Center builds third tug under this project for Russian defense ministry. The vessel is 50% completed; estimated delivery term is 2012.

Just like her predecessor RB-39 , harbor tug RB-10 will join Caspian Flotilla and be stationed in Astrakhan port. The flag-hoisting ceremony is also scheduled on Nov 15, the Caspian Flotilla Day. Currently, the tug is moored at the shipyard and will move to permanent basing site in the next week.

Basic characteristics of Project 705B harbor tug:

Full-load displacement – about 310 tons Dimensions: length – 26.9 meters, beam – 8.7 meters, draft – 2.7 meters Full speed – 12 knots Fuel range – 700 miles Endurance – 5 days Propulsion plant: 2 x 770-shp diesels, 2 x 100-kW diesel generators Crew – 8 men

[mappress]

Source: RusNavy, November 02, 2011

Reach the Offshore Energy industry in one go!

Offshore Energy is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow Offshore Energy on:

Filed under

ShipbuildingNews

Daily Offshore Energy News in Your Mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1Serica’s UK gas footprint widens as it brings Spirit Energy's North Sea assets into its fold
  2. 2Boskalis to install inter-array cables at 1 GW Dutch offshore wind farm
  3. 3Norway's CO2 transport and storage project gets second Swedish customer
  4. 4Vår Energi bolsters its oil & gas portfolio with wrap-up of Pandion buy

Daily Offshore Energy News in Your Mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free