Offshore Energy
  • Fossil Energy
  • Subsea
  • Alternative Fuels
  • Hydrogen
  • Marine Energy
  • More news
JobsNewsletter
Offshore Energy logo

Your trusted source for global offshore energy news, part of the Navingo network.

Topics
  • Fossil Energy
  • Subsea
  • Alternative Fuels
  • Hydrogen
  • Marine Energy
Network
  • Offshore Energy
  • Offshore Wind
  • NavalToday
  • Dredging Today
Company
  • Advertising
  • Newsletter
  • Jobs
  • Report your news
  • Privacy

© 2026 Navingo. All rights reserved.

Home›Shipbuilding›Cochin Shipyard: Keel Laying Ceremony for Two Platform Supply Vessels (India)
Shipbuilding

September 2, 2011 · about 15 years ago

Cochin Shipyard: Keel Laying Ceremony for Two Platform Supply Vessels (India)

The Keel laying ceremony of two Platform Supply Vessels (BY85 & BY 86), being built by CSL for SCI, was conducted at a simple function, today. The Keel of BY 85 laid down by Shri V Radhakrishnan, Director (Technical) and the keel of BY 86 was laid by Shri Ravikumar Roddam, Director (Finance) in the

1 minutes read
  • LinkedIn
  • X
  • Email

The Keel laying ceremony of two Platform Supply Vessels (BY85 & BY 86), being built by CSL for SCI, was conducted at a simple function, today. The Keel of BY 85 laid down by Shri V Radhakrishnan, Director (Technical) and the keel of BY 86 was laid by Shri Ravikumar Roddam, Director (Finance) in the presence of Shri B Chakravarthy, GM (Technical Services), SCI.

These vessels are the first of the Rolls Royce UT 755CD design being built by CSL. These are medium segment Diesel Electric PSV’s designed to cater to meet the all round needs of the Offshore oil and gas industry. The vessel with length of 78 M and breadth of 16 M meets the highest levels of environmental safety denoted by the CLEAN DESIGN notation of M/s Det Norske Veritas and will be dual classed by Indian Register of Shipping, The vessel in addition to the normal offshore supply operations, is capable of carrying methanol and is equipped with Firefighter-I equipment and Dynamic positioning Grade 2 equipment. Accommodation of high standards meeting Comfort Class requirements is arranged for people.

This is the 25 th & 26 th PSV being built by CSL in a time span of 5 years.

[mappress]

ource: Cochin Shipyard ,September 2, 2011;

Reach the Offshore Energy industry in one go!

Offshore Energy is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow Offshore Energy on:

Filed under

ShipbuildingBusiness & Finance

Daily Offshore Energy News in Your Mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 122-year Cheniere-Petrobras LNG pact expands energy bridge between North and South America
  2. 2Next chapter of Shell’s Canadian LNG project brings Fluor-JGC JV multibillion-dollar award
  3. 3Subsea production systems for Mozambique’s deepwater LNG project ordered from OneSubsea
  4. 4Shell’s platform departs for Trinidad & Tobago’s offshore realm as NGC locks in gas from two upcoming projects

Daily Offshore Energy News in Your Mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free