Offshore Energy
  • Fossil Energy
  • Subsea
  • Alternative Fuels
  • Hydrogen
  • Marine Energy
  • More news
JobsNewsletter
Offshore Energy logo

Your trusted source for global offshore energy news, part of the Navingo network.

Topics
  • Fossil Energy
  • Subsea
  • Alternative Fuels
  • Hydrogen
  • Marine Energy
Network
  • Offshore Energy
  • Offshore Wind
  • NavalToday
  • Dredging Today
Company
  • Advertising
  • Newsletter
  • Jobs
  • Report your news
  • Privacy

© 2026 Navingo. All rights reserved.

Home›Offshore Wind›Norddeutsche Seekabelwerke to Supply and Install Submarine Transmission Cables (Germany)
Offshore Wind

June 23, 2011 · about 15 years ago

Norddeutsche Seekabelwerke to Supply and Install Submarine Transmission Cables (Germany)

On June 2, 2011, Norddeutsche Seekabelwerke GmbH (NSW) has been awarded a major order by TenneT TSO GmbH (TenneT), a German-based transmission network operator, for the supply and installation of 2 x 13 kilometers of 155 kV AC submarine transmission cables. The cable will provide the network connect

2 minutes read
  • LinkedIn
  • X
  • Email

On June 2, 2011, Norddeutsche Seekabelwerke GmbH (NSW) has been awarded a major order by TenneT TSO GmbH (TenneT), a German-based transmission network operator, for the supply and installation of 2 x 13 kilometers of 155 kV AC submarine transmission cables.

The cable will provide the network connection of the offshore wind park transformer platform MEG 1 to the converter station DolWin alpha, which is operated by TenneT. DolWin alpha is located in approximately 75 km distance to the German Coast in the North Sea. The offshore converter station DolWin alpha is transforming the wind energy generated offshore from AC into DC current which is being transported a total of 165 km to the converter station Dörpen West. This 800 MW high-voltage direct-current transmission is being realized in TenneT’s project DolWin1.

Production is scheduled to start in 2012. The installation will be presumably carried out in the first half of 2013. In a simultaneous lay-and-burial process the cables will be installed in water depths from 25 meters to 34 meters and buried up to two meters into the soil. NSW will use a chartered DP 2 vessel as well as own offshore installation equipment.

Thorsten Schwarz, Managing Director NSW : “We are very proud that TenneT entrusts us with this project. It clearly shows that NSW with its turnkey product range is now well positioned to satisfy the growing need of the European Wind Industry for HV/AC export cables.”

“The final decision to choose NSW as partner for this project was grounded in NSW’s experience and simply their good offer” , states Frank Bohm, Project Coordinator TenneT for project DolWin1.

[mappress]

Source: nsw, June 23, 2011

Reach the Offshore Energy industry in one go!

Offshore Energy is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow Offshore Energy on:

Filed under

Offshore WindStorage

Daily Offshore Energy News in Your Mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1$50 billion South Korean investment pushes stalled Alaska LNG project closer to construction
  2. 2TGS on 3D imaging mission to unlock new insights into Malaysia's offshore discovery
  3. 3Petrobras strikes another oil-bearing zone in Equatorial Margin frontier
  4. 4MidOcean gets hold of $4 billion in major capital raise to fuel global LNG push

Daily Offshore Energy News in Your Mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free