Offshore Energy
  • Fossil Energy
  • Subsea
  • Alternative Fuels
  • Hydrogen
  • Marine Energy
  • More news
JobsNewsletter
Offshore Energy logo

Your trusted source for global offshore energy news, part of the Navingo network.

Topics
  • Fossil Energy
  • Subsea
  • Alternative Fuels
  • Hydrogen
  • Marine Energy
Network
  • Offshore Energy
  • Offshore Wind
  • NavalToday
  • Dredging Today
Company
  • Advertising
  • Newsletter
  • Jobs
  • Report your news
  • Privacy

© 2026 Navingo. All rights reserved.

Home›Offshore Wind›Van Oord to Build 100-Metre High Meteorological Mast in North Sea
Offshore Wind

February 25, 2011 · about 15 years ago

Van Oord to Build 100-Metre High Meteorological Mast in North Sea

Van Oord has received an assignment from RWE to build a 100-metre high mast in the North Sea to measure maritime meteorological influences. The meteorological mast will be built 75 kilometres from the coast in the ‘IJmuiden’ offshore wind region, which is part of the National Water Plan. The mast wi

1 minutes read
  • LinkedIn
  • X
  • Email

Van Oord has received an assignment from RWE to build a 100-metre high mast in the North Sea to measure maritime meteorological influences. The meteorological mast will be built 75 kilometres from the coast in the ‘IJmuiden’ offshore wind region, which is part of the National Water Plan. The mast will be built on a monopile foundation consisting of a 65-metre steel tube with a diameter of almost 3.5 metres. The tube pile will be driven approximately 40 metres into the sea bed at a location where the sea is 26 metres deep.

It is the first time in Europe that a meteorological mast is being erected so far from the coast. Van Oord will complete the project as EPCI contractor, and the mast is expected to be commissioned in September 2011. The design of the mast took account of the possibility to fix sensors at four different heights (between 30 and 100 metres) to measure and record wind speeds, wind direction, temperature and differences in pressure. In order to facilitate the design of safe and cost-efficient foundations for wind turbines in the future, the mast will also be made suitable for measuring currents, wave heights and wave lengths.

The results of the investigation into wind speeds, currents and wave action will be used in the FLOW consortium (Far and Large Offshore Wind) research and development programme in which Van Oord participates.

[mappress]

Source: vanoord, February 25, 2011

Reach the Offshore Energy industry in one go!

Offshore Energy is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow Offshore Energy on:

Filed under

Offshore WindResearch & DevelopmentTechnology

Daily Offshore Energy News in Your Mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1$50 billion South Korean investment pushes stalled Alaska LNG project closer to construction
  2. 2TGS on 3D imaging mission to unlock new insights into Malaysia's offshore discovery
  3. 3Petrobras strikes another oil-bearing zone in Equatorial Margin frontier
  4. 4MidOcean gets hold of $4 billion in major capital raise to fuel global LNG push

Daily Offshore Energy News in Your Mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free