10000 results found for 'Culzean'

10000 results found for 'Culzean'
Order results by

A list of search results

  • 6 July 2017
    Business & Finance, Operations & Maintenance

    Maersk Oil North Sea UK, operator of the Culzean field, has reached another milestone as the 8,540-tonne central processing facility (CPF) jacket starts its journey across the North Sea. The jacket was built at Heerema Fabrication Group’s Vlissingen facility in the Netherlands. It will be installed by the deepwater construction vessel (DCV) Thialf. According to the […]

  • 25 August 2015
    Business & Finance

    Tenaris, a supplier of tubes and related services for the world’s energy industry, has been awarded a contract to supply casing and related services for Maersk Oil North Sea UK Limited’s Culzean project. This ultra high pressure/high temperature gas project is located in the United Kingdom’s North Sea continental shelf and accounts for six HPHT production […]

  • 3 February 2016
    Exploration & Production

    Danish oil and gas company Maersk Oil has shared a video showing the construction progress of the wellhead platform (WHP) jacket meant for the company’s Culzean field in the UK North Sea. The video shows the jacket being rolled up at Heerema’s Vlissingen shipyard in the Netherlands. Heerema Fabrication Group (HFG), a fabricator of large and complex structures […]

  • 17 January 2024
    Ports & Logistics

    UAE-based logistics giant DP World has gone fossil-free at both its UK logistics hubs with the removal of fossil diesel from its operations at London Gateway.

  • 22 May 2014

    The Maersk Oil UK-operated Culzean project, one of the largest gas discoveries of recent years in the UK North Sea, has taken a significant step forward. Maersk Oil UK and its co-venturers JX Nippon Exploration and Production (UK) Limited and Britoil (BP) have chosen a new standalone facility to develop the discovery: a complex of […]

  • 14 July 2017
    Operations & Maintenance

    An export pipeline for the Maersk Oil Culzean field in the UK North Sea has been laid by Subsea 7. According to Maersk Oil’s latest update, Culzean’s export pipeline has been laid safely and on time by Seven Borealis, the 182-meter pipelay and heavy lift vessel. Subsea 7 secured the subsea, umbilical, riser and flowline […]

  • 19 October 2016
    Business & Finance, Equipment, Project & Tenders

    Royal IHC has signed a new contract for the engineering, procurement and construction of a tandem mooring and offloading system for an FSO vessel (floating, storage and offloading). The offloading system will be placed on the FSO vessel on behalf of Sembcorp Integrated Yard in Singapore. The vessel will be owned and operated by Maersk […]

  • 16 June 2014
    Business & Finance, Operations & Maintenance, Research & Development

    Maersk Oil UK has awarded Ramboll Oil & Gas the detailed design for the Culzean wellhead jacket. The project, which was won in tight international competition, marks Ramboll’s first major involvement in the Culzean field, and it also marks the largest substructure design by Ramboll for the North Sea. Culzean expected to cover 5% of […]

  • 31 August 2015

    UK Oil & Gas Authority has approved the development of what has been described as the largest new field discovered in the UK North Sea, the Culzean. The field, operated by Maersk Oil is expected to produce enough gas to meet 5% of total UK demand at peak production in 2020/21. Culzean is also the […]

  • 13 February 2019
    Project & Tenders

    Total is on the verge of completion of its huge Culzean gas project, which is located in the UK sector of the North Sea.

  • 6 July 2017
    Project & Tenders

    Danish oil company Maersk Oil has informed that Culzean’s 8,540 tonne central processing facility (CPF) jacket has started its journey across the North Sea. The CPF jacket for Maersk Oil-operated Culzean gas development in the UK sector of the North Sea was built by Heerema Fabrication Group’s Vlissingen yard in The Netherlands. It was loaded […]

  • 23 December 2016
    Project & Tenders

    A photo posted by Heerema Fabrication Group (HFG) on social media shows roll up activities at the company’s Vlissingen facility in the Netherlands. According to Heerema, one side of the jacket for the Culzean central processing facilities (CPF) has been lifted in the upright position. The CPF jacket is the second one being produced for […]

  • 20 July 2017
    Project & Tenders

    Dutch contractor Heerema Fabrication Group on Thursday posted an image through its social media channels showing the installation of the Culzean CPF jacket. The Dutch company added that the Culzean ULQ jacket has now also been installed in the UK North Sea.  The Maersk Oil-operated Culzean gas field development concept consists of a wellhead platform, a central […]

  • 25 January 2024
    Business & Finance, Business Developments & Projects, Exploration & Production, Project & Tenders

    Israel’s Navitas Petroleum has revamped its development plan for the Sea Lion project located off the Falkland Islands.

  • 26 January 2017
    Business & Finance

    Norway’s IKM has recently secured a contract award from subsea engineering, construction, and services company Subsea 7 for work on Maersk Oil’s Culzean field in the UK North Sea. Subsea 7 won the subsea, umbilical, riser and flowline (SURF) contract from Maersk Oil back in September 2015. The contract valued more than $150 million was one […]

  • 15 October 2014
    Business & Finance, Equipment, Operations & Maintenance, Project & Tenders

    After a competitive tendering process, Maersk Oil North Sea UK Limited (Maersk Oil UK), operator of the Culzean development in the North Sea, has awarded a contract for the engineering, procurement and construction (EPC) of the project’s well head platform (WHP) jacket to Heerema Hartlepool Limited (Heerema). Heerema will build the WHP jacket and piles, […]

  • 1 September 2015
    Project & Tenders

    Following Monday’s final nod for the Maersk Oil-operated Culzean field in the North Sea, the Danish firm has started awarding contracts for the development. After awarding Singapore’s Sembmarine a $1 billion contract to build offshore facilities for this high-pressure, high-temperature gas field, the Danish company doesn’t stop at that. Namely, Subsea 7 has on Tuesday […]

  • 4 December 2014

    Denmark’s oil company Maersk Oil and its partners in the Culzean field have welcomed the uHPHT (ultra High Pressure, High Temperature) cluster area allowance announced yesterday, as a boost for the future of the UK North Sea. The UK Chancellor of the Exchequer, George Osborne MP, outlined the change during the Government’s Autumn Statement. The allowance […]

  • 30 June 2016
    Exploration & Production, Project & Tenders

    Maersk Drilling’s jack-up drilling rig, the Maersk Highlander, has set off on its voyage to the Culzean gas field in the UK sector of the North Sea. The newbuild harsh environment jack-up rig will work for Maersk Oil on its operated Culzean gas field. Maersk Drilling informed through social media channels on Wednesday that the […]

  • 13 April 2016
    Equipment

    A 114 meters tall jacket, built for Mearsk Oil, has left Heerema’s Vlissingen yard, and it is heading to the Culzean field offshore UK. Maersk Oil received an approval for the field development from the UK Oil & Gas Authority in August 2015. The jacket is a part of a wellhead platform, which along with […]

  • 17 January 2024
    Business Developments & Projects, Research & Development

    Neste and partners have concluded a three-year e-fuel research project demonstrating high-temperature electrolysis (SOEC), carbon capture, and hydrocarbon synthesis technologies and covering all parties in the value chain from carbon capture to green hydrogen and fuel production, logistics, and users of the transportation fuels in aviation, road, and marine transport. During this project, the development […]

  • 8 January 2024
    Business Developments & Projects, Carbon Capture Usage & Storage, Collaboration, Infrastructure, Outlook & Strategy, Research & Development, Transition

    Norwegian energy major Equinor and global industrial gases and engineering company Linde have signed a project development agreement to work as partners on the H2M Eemshaven low-carbon hydrogen project in the Netherlands. Equinor’s H2M Eemshaven project aims to build a production facility in the Eemshaven industrial area, where it will reform natural gas from the […]

  • 7 July 2017
    Project & Tenders

    A jacket for the utility & living quarter (ULQ) platform for the Maersk Oil-operated Culzean field is now on its way to the UK sector of the North Sea.  This is the third and final jacket for the High Pressure High Temperature Culzean development. It set sail on Friday, July 7, shortly after the central processing […]

  • 23 March 2016
    Equipment

    The wellhead platform (WHP) jacket for Maersk Oil’s Culzean field has been loaded onto a barge at Heerema’s Vlissingen yard in preparation for a spring sail away. Heerema Fabrication Group started building the jacket in 2015, and as planned, the jacket is ready for sail away ahead of drilling startup on the project in Q2 […]

  • 18 May 2016
    Equipment, Project & Tenders

    Maersk Oil has reported that a wellhead jacket for the Culzean field’s wellhead platform is now firmly in place in the UK sector of the North Sea.  Maersk Oil-operated Culzean field was discovered in 2008, approximately 250 kilometers east of Aberdeen in license block 22/25a, and the field development was approved in August 2015. The overall Culzean […]