  • 8 May 2014
    Business & Finance, Equipment, Project & Tenders

    From 31 March to 2 April 2014, the Petroleum Safety Authority Norway carried out an audit of Statoil and emergency preparedness management of the Norne FPSO. Objective The objective of the activity was to gain an overview of processes and systems that contribute to ensuring comprehensive emergency preparedness management on the Norne FPSO. Result One […]

  • 3 July 2014
    Business & Finance, Equipment, Operations & Maintenance

    From 11 March 2014 to 16 June 2014, the Petroleum Safety Authority Norway (PSA) carried out an audit of ConocoPhillips. The audit focused on the company’s preparations and plans for permanent plugging and abandonment of the wells at Ekofisk 2/4. The objective of the audit was to follow up the well-specific assessments used as a […]

  • 22 January 2018
    Operations & Maintenance

    Petroleum Safety Authority (PSA) Norway has carried out an audit of the Statoil’s Snorre Expansion project. The objective of the audit was to verify that the Snorre Expansion is being planned and designed in compliance with the company’s own requirements and statutory regulations. No non-conformities or improvement points were identified, PSA said. The background to […]

  • 7 June 2017
    Business & Finance

    Petroleum Safety Authority (PSA) Norway has carried out an audit of how Centrica meets its obligations as a licensee in production licences. Centrica has been a participant on the Norwegian Continental Shelf for ten years. The company is a licensee in 44 production licences and the operator of the Vale field, currently in production, and the […]

  • 3 May 2011
    Business & Finance

    During the period 17–18 March 2011, the Petroleum Safety Authority Norway (PSA) conducted an audit of the COSLPioneer facility targeting the marine technology area. The audit was carried out with assistance from the Norwegian Maritime Directorate (Sdir) and is part of the PSA’s processing of COSL Drilling Europe A/S’ (CDE’s)application for an Acknowledgement of Compliance […]

  • 8 April 2016
    Exploration & Production

    The Norwegian Petroleum Safety Authority found several safety breaches during an audit of Rowan’s jack-up rig Rowan Viking, carried out in February 2016. During the audit, the rig was located on the Edvard Grieg field in the North Sea, offshore Norway. The objective of the audit was to verify compliance with the company’s own requirements […]

  • 9 May 2014
    Business & Finance, Operations & Maintenance

    The Petroleum Safety Authority Norway (PSA) has carried out an audit of Statoil and emergency preparedness management of the Norne FPSO From 31 March to 2 April 2014. Objective The objective of the activity was to gain an overview of processes and systems that contribute to ensuring comprehensive emergency preparedness management on the Norne FPSO. Result […]

  • 20 November 2020
    Authorities & Government, Business Developments & Projects, Exploration & Production, Operations & Maintenance, Regulation & Policy, Rules & Regulation, Safety

    Norwegian offshore safety agency has found nonconformities following audits of the Equinor-operated Johan Castberg and Kristin projects in Norway.

  • 24 April 2014
    Business & Finance

    In the beginning of April, the Petroleum Safety Authority Norway (PSA) carried out an audit of Statoil’s detailed engineering of offshore loading systems for Aasta Hansteen FPSO.   The objective of the audit was to verify that the loading system for Aasta Hansteen was adequately qualified and dimensioned pursuant to applicable regulations. No non-conformities were […]

  • 3 May 2013
    Business & Finance, Operations & Maintenance

    During the period 11 – 13 March 2013, the Petroleum Safety Authority Norway (PSA) carried out an audit of Eni Norge AS’ (Eni’s) compliance with requirements for establishment and implementation of technical and operational barriers in the Goliat project. Objective The objective of the audit was to verify how Eni, through operations preparations, ensures compliance […]

  • 12 November 2014
    Equipment

    From 23 to 25 September 2014, the Petroleum Safety Authority (PSA) Norway carried out an audit of Det norske oljeselskap ASA (Det norske) and barrier management in the Ivar Aasen development project, in the North Sea.  The Ivar Aasen field is situated west of the Johan Sverdrup field in the North Sea, around 30 kilometres south of […]

  • 3 August 2016

    Norway’s offshore safety body, the Petroleum Safety Authority (PSA), has found several non-conformities and improvement points during the audit of Total’s Martin Linge development, offshore Norway. Total E&P Norge (Total) is the operator of the Martin Linge field, located near the British part of the North Sea about 42 kilometers west of the Oseberg field. […]

  • 9 May 2014
    Business & Finance, Equipment, Operations & Maintenance, Research & Development

    The Petroleum Safety Authority Norway (PSA) carried out an audit of detailed engineering of the Polarled pipeline from 11 to 12 March 2014. Objective The objective of the audit was to monitor that the project has been planned and carried out in compliance with applicable regulations and recognised norms, and that requirements in the HSE […]

  • 14 December 2022
    Authorities & Government, Business & Finance, Business Developments & Projects, Operations & Maintenance, Project & Tenders, Regulation & Policy, Rules & Regulation, Safety

    Norwegian offshore safety regulator has carried out an audit of Odfjell Drilling and its risk management on one of its semi-submersible rigs.

  • 28 May 2018
    Exploration & Production

    Offshore driller COSL has some work to do to make its COSLInnovator semi-submersible drilling rig fully compliant with the Norwegian regulation.

  • 9 December 2016

    Norwegian offshore safety body, the Petroleum Safety Authority (PSA), has turned a notification of order to Prosafe into a formal order as a result of the company not fixing irregularities found during an audit of the Safe Scandinavia tender support vessel (TSV) in September 2015. The Safe Scandinavia is an accommodation rig converted to a TSV in […]

  • 22 April 2022
    Authorities & Government, Business & Finance, Business Developments & Projects, Exploration & Production, Project & Tenders, Regulation & Policy, Rules & Regulation

    Equinor has received two types of consent from Norway’s offshore safety regulator for ops in the North Sea with Odfjell Drilling-owned rigs.

  • 13 November 2019
    Business & Finance, Operations & Maintenance

    Petroleum Safety Authority (PSA) Norway has carried out an audit of Vår Energi and its pipe and subsea portfolio on the Norwegian Continental Shelf. The audit, from October this year, included inspection of Vår Energi and its portfolio of pipelines, risers, control cables and subsea facilities on the NCS. The objective of the audit was […]

  • 15 December 2011
    Business & Finance

    The Petroleum Safety Authority Norway (PSA) carried out an audit targeting drilling and well technology systems on board the West Elara jack-up drilling rig. North Atlantic Drilling has applied to the PSA for an AoC (Acknowledgement of Compliance) for West Elara. The facility has not previously had an AoC as it is a newbuild which […]

  • 21 December 2017

    The Norwegian offshore safety body, the Petroleum Safety Authority (PSA), has found an improvement point during an audit of waves on deck on Statoil’s eight facilities off Norway.

  • 20 June 2018
    Business & Finance, Operations & Maintenance

    Petroleum Safety Authority (PSA) Norway has recently carried out an audit of integrity and barrier management for flexible risers and systems for pressure safety/emergency shutdown at Snorre A. PSA said it identified three non-conformities in connection with: Operating parameters for flexible risers and jumpers; Follow-up of emergency shutdown valves; and Integrity management of flexible risers […]

  • 14 July 2014
    Business & Finance

    On 20 and 21 May 2014, the Petroleum Safety Authority Norway (PSA) carried out an audit of Statoil’s barrier management in the early phase of the Johan Sverdrup project prior to the plan for development and operation (PDO). Objective The objective of a pre-PDO audit is to monitor that the operator’s plans and decisions in […]

  • 30 December 2011
    Business & Finance, Equipment

    On 7 and 8 December 2011, the Petroleum Safety Authority Norway (PSA) carried out an audit of Statoil in connection with the engineering of load-bearing structures on Valemon’s jacket. Objective The objective was, through spot checks, to ensure the engineering of the load-bearing structures is taking place pursuant to the applicable regulatory framework. Results No […]

  • 23 April 2018
    Exploration & Production

    Norway’s PSA has found several non-conformities and improvement points during an audit of the Askepott rig and Oseberg H platform off Norway.

  • 6 December 2016

    The Petroleum Safety Authority (PSA) Norway has carried out an audit of Wintershall’s barrier management at Brage. Wintershall Norge is the operator of the Brage field, located in the North Sea, approximately 13 kilometers east of Oseberg. Brage has been developed using an integrated facility on a steel jacket. The oil from the field is transported […]