Advertisement

Clean Fuel

about 11 years ago

Double LNG delivery for UK

The UK’s two LNG terminals on the shores of Milford Haven waterway are scheduled for delivery of liquefied natural gas cargoes.

1 minutes read

The UK’s two LNG terminals on the shores of Milford Haven waterway are scheduled for delivery of liquefied natural gas cargoes on March 6.

The South Hook LNG terminal is scheduled to receive a cargo from Qatar’s Ras Laffan aboard the 266,000 cbm Rasheeda LNG carrier, port data reveals.

The 145,000 cbm Methane Jane Elizabeth is on its way to the UK’s Dragon LNG terminal with a Point Fortin load.

The South Hook terminal can process 15.6 million tonnes of LNG a year and is capable of delivering 21 billion cubic metres of gas a year into the UK’s national transmission system, while the Dragon LNG has a maximum gas send out rate to the NTS of 7.6 billion cubic metres of gas per year.

[mappress mapid=”16847″]

LNG World News Staff; Image: Dragon LNG

Reach the Offshore Energy industry in one go!

Offshore Energy is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow Offshore Energy on:

Daily Offshore Energy News in Your Mailbox

Join thousands of industry professionals who start their day with our newsletter.