Offshore Energy
  • Fossil Energy
  • Subsea
  • Alternative Fuels
  • Hydrogen
  • Marine Energy
  • More news
JobsNewsletter
Offshore Energy logo

Your trusted source for global offshore energy news, part of the Navingo network.

Topics
  • Fossil Energy
  • Subsea
  • Alternative Fuels
  • Hydrogen
  • Marine Energy
Network
  • Offshore Energy
  • Offshore Wind
  • NavalToday
  • Dredging Today
Company
  • Advertising
  • Newsletter
  • Jobs
  • Report your news
  • Privacy

© 2026 Navingo. All rights reserved.

Home›Exploration & Production›New oil & gas discovery set to join North Sea fast-track plays fuelling Europe’s energy security
Exploration & Production

October 14, 2026 · 2 hours ago

New oil & gas discovery set to join North Sea fast-track plays fuelling Europe’s energy security

Equinor, Petoro, and TotalEnergies have found up to 50 million barrels in the North Sea and are eyeing first production in under three years.

MC

Melisa Cavcic

Senior Editor

4 minutes read
  • LinkedIn
  • X
  • Email
Rig at sea
Deepsea Bergen, former Bollsta, semi-submersible rigSource: Odfjell Drilling

As declining mature fields threaten Europe's energy safety net, Norway’s state-owned energy giant Equinor and its partners are planning to waste no time to turn a fresh North Sea oil and gas discovery into fuel, betting on a fast-track playbook that slashes development timelines to just three years by plugging straight into existing infrastructure on the Norwegian Continental Shelf (NCS).

After striking between 19 and 50 million barrels of recoverable oil equivalent (boe), corresponding to 3-8 million standard cubic meters, at the exploration well 30/8-7 S, known as the Grimsnes prospect, near the Oseberg field, Equinor and its partners, Petoro and TotalEnergies, are planning a fast and cost-effective development.

The well was drilled in production license PL 190 by the Deepsea Bergen semi-submersible rig around 15 kilometers southwest of the Oseberg Sør platform and 145 kilometers west of Bergen. According to the Norwegian Offshore Directorate, 30/8-7 S is the fifth exploration well to be drilled in production license 190, which was awarded in the 14th licensing round on the NCS in 1993.

The well was drilled to a vertical depth of 3,752 meters below sea level and terminated in the Drake Formation in the Lower Jurassic, with extensive data collected and samples taken. The water depth at the site is 96 meters. The well has been permanently plugged and abandoned.

While the primary exploration target for the well was to prove petroleum in Middle Jurassic reservoir rocks in the Tarbert Formation, the secondary exploration target was to prove petroleum in Middle Jurassic rocks in the Ness and Etive formations. The well 30/8-7 S encountered a combined oil and gas column totalling 54 meters, including a 39-meter gas column and 15-meter oil column in the Tarbert Formation.

The total thickness of the Tarbert Formation was 264 meters, 111 meters of which were sandstone with moderate to good reservoir properties. In the secondary exploration target in the Ness Formation, the well encountered a sandstone layer totalling 289 meters with variable reservoir quality from poor to very good.

The reservoir was aquiferous with a few potential hydrocarbon-filled zones. In the Etive Formation, the well encountered aquiferous sandstones totalling 10 meters, with moderate reservoir quality. The licensees are looking into potential options for tying the discovery back to existing infrastructure in the Oseberg area.

The well was drilled in the same production license as the Tune field and near the Oseberg Sør field, both of which are operated by Equinor. The Norwegian Offshore Directorate has confirmed that the Deepsea Bergen rig will now proceed to the Visund Sør field to drill a development well. 

Related Articles

Fossil Energy

Equinor files plan for further development of North Sea field, unveils investment of over $1.1bn

6 min read

Frode Skarstein, Senior Vice President for Exploration and Production West at Equinor, underlined: “This confirms that the area around the Oseberg field remains very attractive. We plan to quickly tie the discovery back to existing subsea facilities and produce the volumes through the Oseberg Sør platform. By making use of already paid for infrastructure we achieve good resource utilisation and competitive barrels.”

Equinor emphasizes that Norwegian oil and gas are essential to the European energy security, as Norway covers 20% of Europe's oil needs and 30% of its gas needs. Since production from existing fields is declining as they mature, the firm elaborates that maintaining high activity levels and reliable energy supplies will require continued exploration and development of marginal discoveries near existing infrastructure.

This is the reason why the company plans to drill 200 near-field exploration wells and deliver around 75 subsea developments toward 2035. Equinor's ambition is to maintain production of 1.3 million barrels of oil equivalent per day on the Norwegian Continental Shelf in 2035, with around 70% of this to come from new wells and developments.

Gunnar Nakken, Senior Vice President for Projects and Subsea on the NCS, highlighted: “To bring these discoveries on stream, we must radically change how we plan and develop subsea projects.

“Our aim is to halve both costs and the time from discovery to production through simpler and faster processes, more standardisation, repeatable solutions and more extensive use of industry standards. We expect the partnership to make an investment decision for Grimsnes as early as next summer, with production within three years.”

The Norwegian giant believes that faster execution also means that development concepts to a greater extent will be planned prior to exploration drilling and points out that Grimsnes will most likely be developed with two or three wells in a standard four-slot template.

The discovery will now be matured rapidly toward a decision to continue, and procurement of subsea production equipment is planned early next year, well before the project has been sanctioned. As the equipment is standardized, it can be redeployed elsewhere if a project is not sanctioned by the partnership or approved by the authorities.

Equinor is the operator of the production license, with a 50% ownership interest, while its partners, Petoro and TotalEnergies EP Norge, hold the remaining 40% and 10% stakes, respectively. This license contains the Tune field, which came on stream in 2002.

The Oseberg Sør platform in the North Sea came on stream in 2000. The Oseberg Sør field, which consists of several structures south of the Oseberg field, has been developed with an integrated drilling, accommodation, and production platform with a steel jacket.

The J, K, and Stjerne subsea installations are tied back to the Oseberg Sør platform, and Grimsnes is planned to be tied back to the Stjerne subsea installation. The oil is transported via the Oseberg field centre and the Oseberg transport system to the Sture terminal.

Reach the Offshore Energy industry in one go!

Offshore Energy is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow Offshore Energy on:

Filed under

Exploration & ProductionBusiness Developments & ProjectsBusiness & FinanceFossil EnergyOil & GasRigsNews

Daily Offshore Energy News in Your Mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1Petrobras lands $859 million payout from oil fields deal with Shell, TotalEnergies, and Petrogal
  2. 2EIB backs Fugro's USV technology development with €150 million
  3. 3New oil & gas discovery set to join North Sea fast-track plays fuelling Europe’s energy security
  4. 4Pacifico Energy launches survey campaign for 1.8 GW offshore wind projects in Vietnam

Daily Offshore Energy News in Your Mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free