Offshore Energy
  • Fossil Energy
  • Subsea
  • Alternative Fuels
  • Hydrogen
  • Marine Energy
  • More news
JobsNewsletter
Offshore Energy logo

Your trusted source for global offshore energy news, part of the Navingo network.

Topics
  • Fossil Energy
  • Subsea
  • Alternative Fuels
  • Hydrogen
  • Marine Energy
Network
  • Offshore Energy
  • Offshore Wind
  • NavalToday
  • Dredging Today
Company
  • Advertising
  • Newsletter
  • Jobs
  • Report your news
  • Privacy

© 2026 Navingo. All rights reserved.

Home›Deepwater Installation›OEG secures corrosion protection contract for Gennaker offshore wind farm
Deepwater Installation

August 11, 2026 · about 1 month ago

OEG secures corrosion protection contract for Gennaker offshore wind farm

OEG has secured a contract to provide a subsea corrosion protection system for the 976.5 MW Gennaker offshore wind farm in the German Baltic Sea, developed by Skyborn Renewables. The company will supply an Impressed Current Cathodic Protection (ICCP) system for the wind turbine foundations and is re

1 minutes read
  • LinkedIn
  • X
  • Email
OEG secures corrosion protection contract for Gennaker offshore wind farm
OEG

OEG has secured a contract to provide a subsea corrosion protection system for the 976.5 MW Gennaker offshore wind farm in the German Baltic Sea, developed by Skyborn Renewables.

The company will supply an Impressed Current Cathodic Protection (ICCP) system for the wind turbine foundations and is responsible for the engineering, procurement, manufacturing oversight, offshore logistics, installation, testing and commissioning of the system.

OEG will work with cathodic protection specialist CORROSION on the project and use the ICCP-Subsea Assembly Method (SAM), a remotely operated installation system developed by the two companies.

Engineering and procurement activities are set to begin immediately, followed by manufacturing support, system integration and offshore installation in line with Gennaker’s construction schedule, according to OEG.

Gennaker will comprise 63 Siemens Gamesa’s 15.5 MW SG DD-236++ turbines installed on monopile foundations. Skyborn has awarded the monopile supply contract to EEW Special Pipe Construction, while Dajin Heavy Industry is supplying the transition pieces (TPs).

Offshore installation is scheduled to start in 2027, according to Seaway7, which was awarded the contract for the transportation and installation (T&I) of the 63 monopiles and TPs at the beginning of this year.

The offshore wind farm, located approximately 15 kilometers north of the Fischland-Darß-Zingst peninsula, is planned to be commissioned in 2028.

Reach the Offshore Energy industry in one go!

Offshore Energy is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow Offshore Energy on:

Filed under

Deepwater InstallationOffshore WindSubseaWind FarmsProject & Tenders

Daily Offshore Energy News in Your Mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1TotalEnergies earmarks annual spend of up to $17 billion over next five years
  2. 2Fugro performs ultra-deepwater AUV survey off East Malaysia
  3. 3Southeast Asian oil field development clears key environmental hurdle to move toward FID
  4. 4‘Major’ oil & gas player awards Shearwater with three-year contract off South America

Daily Offshore Energy News in Your Mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free