Offshore Energy
  • Fossil Energy
  • Subsea
  • Alternative Fuels
  • Hydrogen
  • Marine Energy
  • More news
JobsNewsletter
Offshore Energy logo

Your trusted source for global offshore energy news, part of the Navingo network.

Topics
  • Fossil Energy
  • Subsea
  • Alternative Fuels
  • Hydrogen
  • Marine Energy
Network
  • Offshore Energy
  • Offshore Wind
  • NavalToday
  • Dredging Today
Company
  • Advertising
  • Newsletter
  • Jobs
  • Report your news
  • Privacy

© 2026 Navingo. All rights reserved.

Home›Cabling›General cargo vessel turns into cable recovery vessel in Estonia (Video)
Cabling

May 29, 2024 · about 2 years ago

General cargo vessel turns into cable recovery vessel in Estonia (Video)

An Estonian shipbuilding company has carried out the conversion of a general cargo vessel into a fully equipped cable recovery vessel at its premises in Tallinn. BLRT Repair Yards manufactured and installed five cable tanks in the cargo hold, each 8,200 mm high and 10,200 mm wide, weighing a total o

1 minutes read
  • LinkedIn
  • X
  • Email
General cargo vessel turns into cable recovery vessel in Estonia (Video)
Source: BLRT Repair Yards

An Estonian shipbuilding company has carried out the conversion of a general cargo vessel into a fully equipped cable recovery vessel at its premises in Tallinn.

BLRT Repair Yards manufactured and installed five cable tanks in the cargo hold, each 8,200 mm high and 10,200 mm wide, weighing a total of 72 tons, that are used for collecting and storing cables recovered from the seabed, for Mertech Marine’s vessel.

Following the conversion process, managed by WIND, the vessel – renamed from Petra to Grace – is currently on its way towards the Pacific to begin its first cable recovery job.

The conversion project included the manufacture and installation of a 19-ton cable walkway that guides cables being recovered from the seabed to the cable tanks, a cable roller of a 2-meter diameter, weighing over 4 tons, as well as a bow chute, weighing over 4 tons, that serves as a bow roller foundation and cable guidance, capable of withstanding loads over 20 tons

BLRT said it had also installed cable recovery winch and tensioners, seven 10-40 feet containers, rebuilt cargo hold hatches, cargo hold ventilation casing and forward mast, and relocated and rebuilt forward mooring appliances.

This content is available after accepting the cookies.

Reach the Offshore Energy industry in one go!

Offshore Energy is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow Offshore Energy on:

Filed under

CablingSubseaVessels & VehiclesBusiness & FinanceBusiness Developments & ProjectsOutlook & StrategyProject & TendersVessels

Daily Offshore Energy News in Your Mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1Vår Energi bolsters its oil & gas portfolio with wrap-up of Pandion buy
  2. 2LNG-to-FSRU conversion widening Karpowership-backed Kinetics’ gas infrastructure fleet
  3. 3Potential for tidal lagoon in South East Wales being explored
  4. 4After Fugro, TDI-Brooks selected for surveys offshore Timor-Leste

Daily Offshore Energy News in Your Mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free