Offshore Energy
  • Fossil Energy
  • Subsea
  • Alternative Fuels
  • Hydrogen
  • Marine Energy
  • More news
JobsNewsletter
Offshore Energy logo

Your trusted source for global offshore energy news, part of the Navingo network.

Topics
  • Fossil Energy
  • Subsea
  • Alternative Fuels
  • Hydrogen
  • Marine Energy
Network
  • Offshore Energy
  • Offshore Wind
  • NavalToday
  • Dredging Today
Company
  • Advertising
  • Newsletter
  • Jobs
  • Report your news
  • Privacy

© 2026 Navingo. All rights reserved.

Home›Cabling›Marlinks to monitor cables at Baltic Sea offshore wind farm
Cabling

August 3, 2022 · about 4 years ago

Marlinks to monitor cables at Baltic Sea offshore wind farm

Marlinks has won a contract to provide cable health monitoring services for the Arcadis Ost 1 wind farm located offshore Germany in the Baltic Sea. According to Marlinks, Arcadis Ost 1 is situated in an area of the Baltic Sea where challenging seabed conditions are present and a swampy topsoil layer

1 minutes read
  • LinkedIn
  • X
  • Email
Marlinks to monitor cables at Baltic Sea offshore wind farm
Marlinks

Marlinks has won a contract to provide cable health monitoring services for the Arcadis Ost 1 wind farm located offshore Germany in the Baltic Sea.

According to Marlinks, Arcadis Ost 1 is situated in an area of the Baltic Sea where challenging seabed conditions are present and a swampy topsoil layer accelerates the embedment of the subsea cable in lower soil layers and increases the risk for overheating.

Using its Real Time Thermal Rating (RTTR) services, the conductor temperatures of the subsea cables will be monitored with high accuracy, preventing the cable from overheating during normal and peak situations, the company said.

“In the Baltic Sea, the structure of the bottom is not solid and there is very little seabed mobility. Therefore, the top layer of the bottom is very mushy. There is a risk that the cable will be buried too deep in the ground and will get too hot. For this reason, RTTR is necessary during this project,” Marlinks stated.

Related Articles

Cabling

50Hertz connects Arcadis Ost offshore substation to German grid

2 min read

The Arcadis Ost 1 offshore wind farm will comprise 27 Vestas V174-9.5MW turbines situated some 20 kilometers off the Rügen island.

JDR is supplying 45 kilometers of 33kV inter-array cables for the project, while Global Offshore is in charge of the installation .

The 257 MW project is slated for commissioning in 2023.

Register for Offshore Energy Exhibition & Conference:

Reach the Offshore Energy industry in one go!

Offshore Energy is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow Offshore Energy on:

Filed under

CablingDeepwater InstallationGridOffshore WindSubseaWind FarmsBusiness & FinanceBusiness Developments & ProjectsEquipmentOperations & Maintenance

Daily Offshore Energy News in Your Mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1Black Sea mega-project narrows first gas window to early 2027 with work in final execution stage
  2. 2New JV set up in Nigeria for work with TotalEnergies and other oil & gas majors
  3. 3Subsea Micropiles to invest £5 million in expanding manufacturing, offshore ops at Scottish port
  4. 4Electrical fault triggers oil output deferral and rig intervention plans at Karoon’s Brazilian field

Daily Offshore Energy News in Your Mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free