Offshore Energy
  • Fossil Energy
  • Subsea
  • Alternative Fuels
  • Hydrogen
  • Marine Energy
  • More news
JobsNewsletter
Offshore Energy logo

Your trusted source for global offshore energy news, part of the Navingo network.

Topics
  • Fossil Energy
  • Subsea
  • Alternative Fuels
  • Hydrogen
  • Marine Energy
Network
  • Offshore Energy
  • Offshore Wind
  • NavalToday
  • Dredging Today
Company
  • Advertising
  • Newsletter
  • Jobs
  • Report your news
  • Privacy

© 2026 Navingo. All rights reserved.

Home›Cabling›Manor Marine to build dredge support vessel
Cabling

April 18, 2022 · about 4 years ago

Manor Marine to build dredge support vessel

Manor Marine has just introduced a plan for building a 20 metre Multi Purpose Vessel, suitable for a range of applications. Construction will be undertaken at the fabrication and engineering facility in Portland, Dorset. Focused on the offshore renewables industry, the vessel is designed for multi-p

1 minutes read
  • LinkedIn
  • X
  • Email
Manor Marine to build dredge support vessel
Manor

Manor Marine has just introduced a plan for building a 20 metre Multi Purpose Vessel, suitable for a range of applications.

Construction will be undertaken at the fabrication and engineering facility in Portland, Dorset.

Focused on the offshore renewables industry, the vessel is designed for multi-purpose uses.

According to Manor, the vessel will be suitable for dredge support, subsea cable support, towage, buoyage maintenance, marine civil engineering and dive support.

Construction is due to start in June 2022, said the company.

Constructed using all welded steel, the vessel will be of single chine construction and will feature a fully fitted out wheelhouse, deck cargo carrying capacity of 20 tonnes, estimated bollard pull of 12 tonnes and a working deck area totalling 70m2.

An Effer 850.8 deck crane will be installed with a lifting capacity of 2.4 tonnes at 20 metres.

At 20 metres in length, the vessel will have an approximate maximum speed of 10 knots, achieved with two Volvo Penta D13-MH marine propulsion engines; the vessel will be suitable for operation in coastal waters (up to 20 miles from the shore) and the craft will be built in accordance with Lloyd’s Register Regulations and to MCA Workboat Code CAT 2.

The vessel is scheduled to be completed in early 2023.

Reach the Offshore Energy industry in one go!

Offshore Energy is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow Offshore Energy on:

Filed under

CablingDredgingSubseaTechnology

Daily Offshore Energy News in Your Mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 122-year Cheniere-Petrobras LNG pact expands energy bridge between North and South America
  2. 2Next chapter of Shell’s Canadian LNG project brings Fluor-JGC JV multibillion-dollar award
  3. 3Subsea production systems for Mozambique’s deepwater LNG project ordered from OneSubsea
  4. 4Shell’s platform departs for Trinidad & Tobago’s offshore realm as NGC locks in gas from two upcoming projects

Daily Offshore Energy News in Your Mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free