Offshore Energy
  • Fossil Energy
  • Subsea
  • Alternative Fuels
  • Hydrogen
  • Marine Energy
  • More news
JobsNewsletter
Offshore Energy logo

Your trusted source for global offshore energy news, part of the Navingo network.

Topics
  • Fossil Energy
  • Subsea
  • Alternative Fuels
  • Hydrogen
  • Marine Energy
Network
  • Offshore Energy
  • Offshore Wind
  • NavalToday
  • Dredging Today
Company
  • Advertising
  • Newsletter
  • Jobs
  • Report your news
  • Privacy

© 2026 Navingo. All rights reserved.

Home›Fossil Energy›Empyrean hopes for short wait as bad weather hinders rig mobilisation off China
Fossil Energy

March 31, 2022 · about 4 years ago

Empyrean hopes for short wait as bad weather hinders rig mobilisation off China

Empyrean is anticipating a short wait until the start of drilling off China after rig mobilisation was hindered again due to bad weather.

3 minutes read
  • LinkedIn
  • X
  • Email
Empyrean hopes for short wait as bad weather hinders rig mobilisation ops off China
COSL-owned NH9 rig; Source: Nevsky Shipyard

Despite high winds and seas, which hindered its rig mobilisation after it was cleared for operations, Empyrean Energy is looking on the bright side, expecting a short wait until the wheels can be put in motion to start drilling the Jade prospect well, located in Block 29/11 offshore China.

This is not the first delay Empyrean encountered so far, as the previous timeline for the drilling of the Jade prospect – planned between 15 December to 30 December 2021 after an integrated drilling contract was executed with China Oilfield Services Limited (COSL) in November 2021 – was also delayed due to poor weather conditions .

After discussions with COSL and China National Offshore Oil Company (CNOOC) to finalise rig availability and an anticipated spud date for the well, Empyrean managed to work out a rig slot with its Chinese partners earlier this month.

Last week, Empyrean confirmed that the rig mobilisation was expected to take place on or around 27 March, while the spud date was anticipated on or around 2 April 2022, depending on prevailing weather conditions to ensure the safe anchorage of the COSL-owned NH9 rig at the Jade location.

Related Articles

Fossil Energy

Empyrean days away from spudding exploration well off China

3 min read

In an update on Wednesday, Empyrean Energy informed that safety inspections were carried out following the handover of the rig. The NH9 rig has been cleared to move to the Jade well location pending suitable weather conditions. Currently, the rig is still on location and anchored at the CNOOC well, which it drilled immediately preceding mobilisation to Jade.

Commenting on the latest delay, Tom Kelly , Empyrean CEO, stated: “We look forward to re-commencing rig mobilisation operations as soon as weather conditions allow for safe working conditions. Based on the current long-range forecast, we do not expect the wait to be very long .”

Empyrean intends to provide a further update on its progress after weather conditions allow rig operations to re-start. The company also explains that COSL will provide a new anticipated spud date once sea conditions improve and operations can re-commence, adding that safety protocols require sea conditions to be six or less on the Beaufort Scale for towing and anchoring operations expected to take four days in total.

The well is anticipated to take approximately 26 days to drill to total depth on a trouble-free basis as no overly challenging drilling zones are anticipated with the Jade well design and program. Although, if the well intercepts a hydrocarbon zone – as anticipated – then testing is planned to take approximately a further two weeks.

Empyrean is the operator of Block 29/11 in China with 100 per cent working interest during the exploration phase. However, its partner, CNOOC, may assume a 51 per cent participating interest in the development and production phase in the event of a commercial discovery.

The Jade prospect has a GCA audited mean in place potential of 225 MMbbl and a P10 in place upside of 395 MMbbl , while four of CNOOC’s recent nearby discoveries – with gas clouds showing in the overburden on seismic – immediately to the west of the Jade prospect are filled to their P10 potential or even better.

Reach the Offshore Energy industry in one go!

Offshore Energy is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow Offshore Energy on:

Filed under

Fossil EnergyOil & GasRigsBusiness & FinanceBusiness Developments & ProjectsExploration & ProductionProject & Tenders

Daily Offshore Energy News in Your Mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1Connecting the offshore energy industry through smarter travel
  2. 2Borr Drilling’s rig trio lines up jobs in Africa and Europe
  3. 3Inpex broadens its Southeast Asian horizons with two offshore blocks
  4. 4Dutch LNG terminal capacity rises to 20 billion cubic meters with 4th tank

Daily Offshore Energy News in Your Mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free