Offshore Energy
  • Fossil Energy
  • Subsea
  • Alternative Fuels
  • Hydrogen
  • Marine Energy
  • More news
JobsNewsletter
Offshore Energy logo

Your trusted source for global offshore energy news, part of the Navingo network.

Topics
  • Fossil Energy
  • Subsea
  • Alternative Fuels
  • Hydrogen
  • Marine Energy
Network
  • Offshore Energy
  • Offshore Wind
  • NavalToday
  • Dredging Today
Company
  • Advertising
  • Newsletter
  • Jobs
  • Report your news
  • Privacy

© 2026 Navingo. All rights reserved.

Home›Fossil Energy›Noble rig preparing to drill surface hole for Santos well
Fossil Energy

February 9, 2022 · about 4 years ago

Noble rig preparing to drill surface hole for Santos well

The Noble Tom Prosser rig has arrived at the site and is about to drill the Santos-operated Pavo-1 well offshore Australia.

2 minutes read
  • LinkedIn
  • X
  • Email
Noble Tom Prosser
Noble Tom Prosser; Source: Carnarvon

The Noble Tom Prosser jack-up rig has arrived at the site and is about to drill the Santos-operated Pavo-1 well in the Bedout Basin offshore Australia.

The Pavo-1 well is located in permit WA-438-P which is operated by Santos with a 70 per cent interest while Carnarvon holds the remaining 30 per cent interest.

The Noble-owned rig was mobilised to the site late last week. Carnarvon Energy informed on Wednesday that the rig has now completed the move to the Pavo-1 well location and has concluded the jack-down and other pre-drill operations. As of 06:00 this morning the rig was preparing to start drilling the surface hole, Carnarvon said.

Related Articles

Fossil Energy

Noble rig on the move to drill Santos wells

3 min read

The rig will drill the surface hole down to around 175 metres Measured Depth (MD) and install the conductor.

After the conductor has been set and cemented in place, the rig will drill the 17 ½” hole to the planned section depth of approximately 1,000 metres MD followed by setting the 13 3/8” casing. The well will then be deepened in the 12 ¼” hole to around 3,000 metres MD before setting the 9 5/8” liner. This will provide a stable foundation for the well to drill into the deeper reservoir section.

No hydrocarbons are anticipated to be encountered in these hole sections.

The Pavo-1 well is targeting a gross mean recoverable volume of 82 million barrels of liquids and 108 Bcf of gas in the Caley Formation sands which flow tested at equipment limits of around 11,000 barrels of oil per day in the Dorado-3 well. This is an attractive prospect, having an estimated one-in-three (34 per cent) geological probability of success.

As Carnarvon holds a 30 per cent interest in this resource, meaning the net liquids resource could be similar in volume to Carnarvon’s interest in the Dorado field in a success case.

After drilling the primary Caley target, the joint venture has the option to drill into deeper stratigraphy including the Lower Archer Formation Dumont Member sands, and the Permian carbonates. Information from these intervals will be highly valuable in assessing the substantial exploration potential north and east of the Pavo prospect.

Following completion of the Pavo-1 well, the rig will drill the Apus-1 well which is located around 20km southwest of the Pavo-1 well location.

Reach the Offshore Energy industry in one go!

Offshore Energy is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow Offshore Energy on:

Filed under

Fossil EnergyOil & GasRigsBusiness & FinanceBusiness Developments & ProjectsExploration & ProductionProject & Tenders

Daily Offshore Energy News in Your Mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1Black Sea mega-project narrows first gas window to early 2027 with work in final execution stage
  2. 2New JV set up in Nigeria for work with TotalEnergies and other oil & gas majors
  3. 3Subsea Micropiles to invest £5 million in expanding manufacturing, offshore ops at Scottish port
  4. 4Electrical fault triggers oil output deferral and rig intervention plans at Karoon’s Brazilian field

Daily Offshore Energy News in Your Mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free