Offshore Energy
  • Fossil Energy
  • Subsea
  • Alternative Fuels
  • Hydrogen
  • Marine Energy
  • More news
JobsNewsletter
Offshore Energy logo

Your trusted source for global offshore energy news, part of the Navingo network.

Topics
  • Fossil Energy
  • Subsea
  • Alternative Fuels
  • Hydrogen
  • Marine Energy
Network
  • Offshore Energy
  • Offshore Wind
  • NavalToday
  • Dredging Today
Company
  • Advertising
  • Newsletter
  • Jobs
  • Report your news
  • Privacy

© 2026 Navingo. All rights reserved.

Home›Cabling›CRA pipeline installed at Julimar phase 2 project
Cabling

August 24, 2021 · about 5 years ago

CRA pipeline installed at Julimar phase 2 project

Subsea 7 has completed the installation and hydrotesting of the 22-kilometer Corrosion Resistant Alloy (CRA) pipeline at Woodside Energy’s Julimar Development Phase 2 project in Australia. The company’s reel-lay vessel Seven Oceans was in charge of installing what is said to be Australia’s first ree

1 minutes read
  • LinkedIn
  • X
  • Email
CRA pipeline installed at Julimar phase 2 project
Subsea 7

Subsea 7 has completed the installation and hydrotesting of the 22-kilometer Corrosion Resistant Alloy (CRA) pipeline at Woodside Energy’s Julimar Development Phase 2 project in Australia.

The company’s reel-lay vessel Seven Oceans was in charge of installing what is said to be Australia’s first reeled 18” insulated CRA pipeline.

The Julimar field is located approximately 200 kilometers offshore North-Western Australia.

Subsea 7’s full scope of work is to design, procure, install and commission the CRA gas transmission flowline and an umbilical system, under a contract secured at the end of 2019.

This March, Woodside received approval from Australian offshore regulator NOPSEMA for the revised environment plan for the operation of a petroleum pipeline and any other petroleum-related activity on the Julimar field.

The Perth-headquartered company is the operator of the field production system (FPS), located in Commonwealth waters about 160 kilometers north-west of Dampier and adjacent to the Chevron-operated Wheatstone platform.

The Julimar FPS, which started production in 2016, includes wells in WA-49-L and flowlines/pipelines in WA-26-PL and WA-29-PL.

The start-up activities associated with the Phase 2 wells and associated subsea infrastructure are planned to start in mid-2021.

Related Articles

Clean Fuel

Green light to Woodside for Julimar operations

2 min read

Reach the Offshore Energy industry in one go!

Offshore Energy is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow Offshore Energy on:

Filed under

CablingDeepwater InstallationFossil EnergySubseaBusiness Developments & ProjectsProject & Tenders

Daily Offshore Energy News in Your Mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 122-year Cheniere-Petrobras LNG pact expands energy bridge between North and South America
  2. 2Next chapter of Shell’s Canadian LNG project brings Fluor-JGC JV multibillion-dollar award
  3. 3Subsea production systems for Mozambique’s deepwater LNG project ordered from OneSubsea
  4. 4Shell’s platform departs for Trinidad & Tobago’s offshore realm as NGC locks in gas from two upcoming projects

Daily Offshore Energy News in Your Mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free