Offshore Energy
  • Fossil Energy
  • Subsea
  • Alternative Fuels
  • Hydrogen
  • Marine Energy
  • More news
JobsNewsletter
Offshore Energy logo

Your trusted source for global offshore energy news, part of the Navingo network.

Topics
  • Fossil Energy
  • Subsea
  • Alternative Fuels
  • Hydrogen
  • Marine Energy
Network
  • Offshore Energy
  • Offshore Wind
  • NavalToday
  • Dredging Today
Company
  • Advertising
  • Newsletter
  • Jobs
  • Report your news
  • Privacy

© 2026 Navingo. All rights reserved.

Home›Cabling›Inter-array cable work set to start at Neart na Gaoithe OWF
Cabling

July 30, 2021 · about 5 years ago

Inter-array cable work set to start at Neart na Gaoithe OWF

Pre-lay trenching work along a number of inter-array cable routes within the Neart Na Gaoithe (NnG) wind farm site are due to begin around 7 August, ahead of the installation of cables at a later date. The inter-array cable routes will be trenched by a remotely operated vehicle (ROV) which will be d

1 minutes read
  • LinkedIn
  • X
  • Email
The green Living Stone cable laying vessel
DEME; CLV Living Stone

Pre-lay trenching work along a number of inter-array cable routes within the Neart Na Gaoithe (NnG) wind farm site are due to begin around 7 August, ahead of the installation of cables at a later date.

The inter-array cable routes will be trenched by a remotely operated vehicle (ROV) which will be deployed and controlled from the Living Stone vessel.

The activities will start with pre-trenching survey on the inter-array cable routes, to be carried out by the vessel Guardian.

Once complete and the routes are confirmed clear of any seabed obstructions, the ROV equipped with a jetting tool and mechanical cutting tool will be deployed for pre-lay trenching. The ROV will be guided to the inter-array cable routes and commence cutting operations along the seabed.

Guardian will also perform a post-trenching survey to monitor the trenching depth and, from 6 September, an additional vessel will join the fleet on the site to undertake survey and crew transfer operations.

Neart na Gaoithe, located some 15 kilometers off the Fife coast in Scotland, will comprise 54 Siemens Gamesa 8 MW turbines.

The 450 MW project entered the offshore construction phase in August 2020 and the export cable work for the project is now nearing completion.

The offshore wind farm is expected to be fully commissioned in 2023.

Reach the Offshore Energy industry in one go!

Offshore Energy is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow Offshore Energy on:

Filed under

CablingOffshore WindSubseaWind FarmsBusiness Developments & ProjectsProject & Tenders

Daily Offshore Energy News in Your Mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 122-year Cheniere-Petrobras LNG pact expands energy bridge between North and South America
  2. 2Next chapter of Shell’s Canadian LNG project brings Fluor-JGC JV multibillion-dollar award
  3. 3Subsea production systems for Mozambique’s deepwater LNG project ordered from OneSubsea
  4. 4Shell’s platform departs for Trinidad & Tobago’s offshore realm as NGC locks in gas from two upcoming projects

Daily Offshore Energy News in Your Mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free