Offshore Energy
  • Fossil Energy
  • Subsea
  • Alternative Fuels
  • Hydrogen
  • Marine Energy
  • More news
JobsNewsletter
Offshore Energy logo

Your trusted source for global offshore energy news, part of the Navingo network.

Topics
  • Fossil Energy
  • Subsea
  • Alternative Fuels
  • Hydrogen
  • Marine Energy
Network
  • Offshore Energy
  • Offshore Wind
  • NavalToday
  • Dredging Today
Company
  • Advertising
  • Newsletter
  • Jobs
  • Report your news
  • Privacy

© 2026 Navingo. All rights reserved.

Home›Cabling›EDS HV secures cable work at Triton Knoll OWF
Cabling

March 11, 2021 · about 5 years ago

EDS HV secures cable work at Triton Knoll OWF

EDS HV, part of James Fisher and Sons, has secured a cable termination and testing contract for the Triton Knoll offshore wind project in the UK. The scope includes the installation and termination of high voltage cables between the foundations and the turbine switchgear, with pre-testing, mock-up t

1 minutes read
  • LinkedIn
  • X
  • Email
EDS-HV-Secures-Cable-Work-at-Triton-Knoll
EDS HV

EDS HV, part of James Fisher and Sons, has secured a cable termination and testing contract for the Triton Knoll offshore wind project in the UK.

The scope includes the installation and termination of high voltage cables between the foundations and the turbine switchgear, with pre-testing, mock-up trials and cable preparation already been undertaken in late 2020.

“This particular project includes onshore project management supported by an EDS HV HSE Advisor with technical engineering support,” said Lee Glendening , Termination and Testing Business Manager at EDS HV.

“Due to the location we can work from the strategically positioned EDS HV base in Grimsby that supports the local economy and RWE Renewables’ aspiration of achieving at least 50% local content during construction of Triton Knoll.”

Located over 32 km off the Lincolnshire coast, Triton Knoll will comprise 90 Vestas V164-9.5 MW turbines slated for full commissioning in 2022.

The 857 MW wind farm, which recently delivered its first power, is owned by RWE (59%), J-Power (25%) and Kansai Electric Power (16%), with RWE leading both the project construction and the long-term O&M works.

At the beginning of the month, NKT finalized the manufacturing and delivery of both the export cable system and the inter-array cables for Triton Knoll.

Reach the Offshore Energy industry in one go!

Offshore Energy is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow Offshore Energy on:

Filed under

CablingGridOffshore WindSubseaWind FarmsProject & Tenders

Daily Offshore Energy News in Your Mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1Electrical fault triggers oil output deferral and rig intervention plans at Karoon’s Brazilian field
  2. 2TotalEnergies’ Caspian Sea gas and condensate field expansion is a go
  3. 3TotalEnergies earmarks annual spend of up to $17 billion over next five years
  4. 4Fugro performs ultra-deepwater AUV survey off East Malaysia

Daily Offshore Energy News in Your Mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free