Offshore Energy
  • Fossil Energy
  • Subsea
  • Alternative Fuels
  • Hydrogen
  • Marine Energy
  • More news
JobsNewsletter
Offshore Energy logo

Your trusted source for global offshore energy news, part of the Navingo network.

Topics
  • Fossil Energy
  • Subsea
  • Alternative Fuels
  • Hydrogen
  • Marine Energy
Network
  • Offshore Energy
  • Offshore Wind
  • NavalToday
  • Dredging Today
Company
  • Advertising
  • Newsletter
  • Jobs
  • Report your news
  • Privacy

© 2026 Navingo. All rights reserved.

Home›Fossil Energy›Kværner orders slipform systems for Hywind Tampen floating wind farm
Fossil Energy

February 16, 2021 · about 5 years ago

Kværner orders slipform systems for Hywind Tampen floating wind farm

Kværner has selected German engineering company Dominion for the design, supply, and supervision services for the slipform systems that will erect the concrete wind towers for the Hywind Tampen floating wind project. Dominion said its cylindrical and conical sets of slipform systems can be used mult

2 minutes read
  • LinkedIn
  • X
  • Email
An image illustrating a Hywind Tampen floating wind turbine above and under water
Equinor

Kværner has selected German engineering company Dominion for the design, supply, and supervision services for the slipform systems that will erect the concrete wind towers for the Hywind Tampen floating wind project.

Dominion said its cylindrical and conical sets of slipform systems can be used multiple times and include hydraulic jacking system, formwork material, yokes and required decks.

“Concrete is poured continuously, 24/7 if necessary, into a single form that is steadily elevated to create the designed form. This technology features low manpower needs, safe and fast execution” , the company said via social media.

Kværner, which merged with Aker S olutions last year, is in charge of the engineering, procurement, and construction of the floating concrete substructures for Hywind Tampen under a contract worth around NOK 1.5 billion (approx. EUR 146 million). The company will also deliver marine operations in a 50/50 joint venture with DOF Subsea.

The fabrication work started in October 2020 with the cutting of the first sheet of steel at Kværner Stord in Norway.

Related Articles

Fossil Energy

Construction starts on world’s largest floating offshore wind farm

3 min read

Developed by Equinor, together with its Snorre and Gullfaks partners, the 88 MW Hywind Tampen floating wind farm will be the first of its kind to power oil & gas platforms. Eleven Siemens Gamesa 8 MW turbines are expected to cover about 35 per cent of the annual power needs on the five platforms Snorre A and B and Gullfaks A, B and C in the Norwegian North Sea.

Located about 140 kilometres off the Norwegian coast in water depths of between 260 and 300 metres, Hywind Tampen will reduce emissions from the Gullfaks and Snorre fields by more than 200,000 tonnes per year, once it is operational in 2022.

Reach the Offshore Energy industry in one go!

Offshore Energy is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow Offshore Energy on:

Filed under

Fossil EnergyOffshore WindOil & GasTurbinesWind FarmsBusiness Developments & ProjectsProject & Tenders

Daily Offshore Energy News in Your Mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1Electrical fault triggers oil output deferral and rig intervention plans at Karoon’s Brazilian field
  2. 2TotalEnergies’ Caspian Sea gas and condensate field expansion is a go
  3. 3TotalEnergies earmarks annual spend of up to $17 billion over next five years
  4. 4Fugro performs ultra-deepwater AUV survey off East Malaysia

Daily Offshore Energy News in Your Mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free