Offshore Energy
  • Fossil Energy
  • Subsea
  • Alternative Fuels
  • Hydrogen
  • Marine Energy
  • More news
JobsNewsletter
Offshore Energy logo

Your trusted source for global offshore energy news, part of the Navingo network.

Topics
  • Fossil Energy
  • Subsea
  • Alternative Fuels
  • Hydrogen
  • Marine Energy
Network
  • Offshore Energy
  • Offshore Wind
  • NavalToday
  • Dredging Today
Company
  • Advertising
  • Newsletter
  • Jobs
  • Report your news
  • Privacy

© 2026 Navingo. All rights reserved.

Home›Energy Efficiency & Innovation›DP World Antwerp Gateway orders fleet of automated stacking cranes
Energy Efficiency & Innovation

January 19, 2021 · about 5 years ago

DP World Antwerp Gateway orders fleet of automated stacking cranes

DP World Antwerp Gateway has ordered a fleet of 34 Automated Stacking Cranes (Konecranes Gottwald ARMGs) for its container terminal in Antwerp, Belgium. The cranes will be an expansion to the current fleet of 20 ARMGs currently in operation. The first batch will be delivered in Q2 2022, the last bat

2 minutes read
  • LinkedIn
  • X
  • Email
DP World
Image by Konecranes

DP World Antwerp Gateway has ordered a fleet of 34 Automated Stacking Cranes (Konecranes Gottwald ARMGs) for its container terminal in Antwerp, Belgium.

The cranes will be an expansion to the current fleet of 20 ARMGs currently in operation. The first batch will be delivered in Q2 2022, the last batch by 2026. This order was booked in December 2020.

DP World Antwerp Gateway wants to continue its current ASC system delivered by Gottwald in 2006.

“We had a series of deep discussions with Konecranes regarding every aspect of our automation expansion at our terminal. Eventually, we were convinced that Konecranes could provide every dimension needed. We need technology continuation of our current ASC concept,” Jef Lambregts , Head of Projects at DP World Antwerp Gateway, said.

“We want to take advantage of the latest developments in automation technology. We will get improved automated truck handling and remote operation ergonomics.”

The new ASC system order will follow the Gottwald ARMG design concept, the most notable physical feature being the rigid guiding beam for container load control.

The ARMGs will stack containers 1-over-6 spanning 9 container rows.

A new trolley design has been developed to support an increased lifting height and it will include a hybrid of existing systems for auto-landing on the truck chassis.

As part of the project, TBA will extend the existing Equipment Control System (ECS) used at the terminal.

Port Services from Konecranes will also be part of the delivery.

Reach the Offshore Energy industry in one go!

Offshore Energy is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow Offshore Energy on:

Filed under

Energy Efficiency & InnovationGreen MarineAutomationEquipmentInfrastructurePorts & Logistics

Daily Offshore Energy News in Your Mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1Electrical fault triggers oil output deferral and rig intervention plans at Karoon’s Brazilian field
  2. 2TotalEnergies’ Caspian Sea gas and condensate field expansion is a go
  3. 3TotalEnergies earmarks annual spend of up to $17 billion over next five years
  4. 4Fugro performs ultra-deepwater AUV survey off East Malaysia

Daily Offshore Energy News in Your Mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free