Offshore Energy
  • Fossil Energy
  • Subsea
  • Alternative Fuels
  • Hydrogen
  • Marine Energy
  • More news
JobsNewsletter
Offshore Energy logo

Your trusted source for global offshore energy news, part of the Navingo network.

Topics
  • Fossil Energy
  • Subsea
  • Alternative Fuels
  • Hydrogen
  • Marine Energy
Network
  • Offshore Energy
  • Offshore Wind
  • NavalToday
  • Dredging Today
Company
  • Advertising
  • Newsletter
  • Jobs
  • Report your news
  • Privacy

© 2026 Navingo. All rights reserved.

Home›Offshore Wind›RVO issues IJmuiden Ver integrated ground model tender
Offshore Wind

July 20, 2020 · about 6 years ago

RVO issues IJmuiden Ver integrated ground model tender

The Netherlands Enterprise Agency (RVO) has issued a tender for the development of an integrated ground model for the 4 GW IJmuiden Ver wind farm zone. The objective of this tender is to conclude an agreement with a tenderer who is able to develop an Integrated Ground Model (IGM) and a Geotechnical

2 minutes read
  • LinkedIn
  • X
  • Email
RVO issues IJmuiden Ver integrated ground model tender
TenneT/Illustration

The Netherlands Enterprise Agency (RVO) has issued a tender for the development of an integrated ground model for the 4 GW IJmuiden Ver wind farm zone.

The objective of this tender is to conclude an agreement with a tenderer who is able to develop an Integrated Ground Model (IGM) and a Geotechnical Interpretative Report for the IJmuiden Ver. This integrated ground model and geotechnical interpretative report should be of sufficient accuracy to allow (preliminary) foundation design.

The deliverables of this assignment will be made available to the participants in the concession tenders for the IJmuiden Ver offshore wind farm zone in the fourth quarter of 2022 at the latest.

The IGM will be made based on the results of the geophysical work that is currently ongoing at IJmuiden Ver. It will then be used as input for the geotechnical campaign which will validate the geological model resulting from the geophysical investigation and to confirm the soil engineering properties required by developers to progress with their geotechnical foundation designs and other general design and installation requirements for the wind farm, as well as those relating to cable installation.

The contract will run from 21 October 2020 to the end of 2022, and is subject to renewals. The tender remains open until 27 August.

Located some 62 kilometres off the west coast of the Netherlands, the 400km2 Ijmuiden Ver zone is divided into four sites – IJmuiden Ver I,II, III, and IV.

The Dutch government will issue two tenders for the permits to develop the sites, in 2023 for IJmuiden Ver I and II, and in 2025 for IJmuiden Ver III and IV.

Reach the Offshore Energy industry in one go!

Offshore Energy is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow Offshore Energy on:

Filed under

Offshore WindSubseaSurveys & InterventionsWind FarmsProject & Tenders

Daily Offshore Energy News in Your Mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1Electrical fault triggers oil output deferral and rig intervention plans at Karoon’s Brazilian field
  2. 2TotalEnergies’ Caspian Sea gas and condensate field expansion is a go
  3. 3TotalEnergies earmarks annual spend of up to $17 billion over next five years
  4. 4Fugro performs ultra-deepwater AUV survey off East Malaysia

Daily Offshore Energy News in Your Mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free