Offshore Energy
  • Fossil Energy
  • Subsea
  • Alternative Fuels
  • Hydrogen
  • Marine Energy
  • More news
JobsNewsletter
Offshore Energy logo

Your trusted source for global offshore energy news, part of the Navingo network.

Topics
  • Fossil Energy
  • Subsea
  • Alternative Fuels
  • Hydrogen
  • Marine Energy
Network
  • Offshore Energy
  • Offshore Wind
  • NavalToday
  • Dredging Today
Company
  • Advertising
  • Newsletter
  • Jobs
  • Report your news
  • Privacy

© 2026 Navingo. All rights reserved.

Home›Cabling›DEME wraps up inter-array cable laying work at SeaMade offshore wind farm
Cabling

May 27, 2020 · about 6 years ago

DEME wraps up inter-array cable laying work at SeaMade offshore wind farm

DEME Group has completed inter-array cable laying works at the SeaMade offshore wind farm in Belgium. DEME’s DP3 cable installation vessel Living Stone laid 64 inter-array cables with a total length of 71.2km. According to the company, the vessel operated at peak production levels, laying up to thre

1 minutes read
  • LinkedIn
  • X
  • Email
DEME-Wraps-Up-SeaMade-Inter-Array-Cable-Laying-Work
DEME Group

DEME Group has completed inter-array cable laying works at the SeaMade offshore wind farm in Belgium.

DEME’s DP3 cable installation vessel Living Stone laid 64 inter-array cables with a total length of 71.2km.

According to the company, the vessel operated at peak production levels, laying up to three cables per day.

To remind, the inter-array works started in mid-April. The cable was provided by JDR Cable Systems.

SeaMade comprises the 235 MW Mermaid and the 252 MW Seastar projects which will feature 58 Siemens Gamesa SG 8.0-167 DD turbines. Project commissioning is expected by the end of the year.

Reach the Offshore Energy industry in one go!

Offshore Energy is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow Offshore Energy on:

Filed under

CablingOffshore WindSubseaWind FarmsProject & Tenders

Daily Offshore Energy News in Your Mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1Electrical fault triggers oil output deferral and rig intervention plans at Karoon’s Brazilian field
  2. 2TotalEnergies’ Caspian Sea gas and condensate field expansion is a go
  3. 3TotalEnergies earmarks annual spend of up to $17 billion over next five years
  4. 4Fugro performs ultra-deepwater AUV survey off East Malaysia

Daily Offshore Energy News in Your Mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free