Offshore Energy
  • Fossil Energy
  • Subsea
  • Alternative Fuels
  • Hydrogen
  • Marine Energy
  • More news
JobsNewsletter
Offshore Energy logo

Your trusted source for global offshore energy news, part of the Navingo network.

Topics
  • Fossil Energy
  • Subsea
  • Alternative Fuels
  • Hydrogen
  • Marine Energy
Network
  • Offshore Energy
  • Offshore Wind
  • NavalToday
  • Dredging Today
Company
  • Advertising
  • Newsletter
  • Jobs
  • Report your news
  • Privacy

© 2026 Navingo. All rights reserved.

Home›Subsea›Shell Wraps Up Gumusut-Kakap Phase 2 Project in Malaysia
Subsea

September 30, 2019 · about 7 years ago

Shell Wraps Up Gumusut-Kakap Phase 2 Project in Malaysia

Sabah Shell Petroleum, the operator of the Gumusut-Kakap (GK) semi Floating Production System located offshore Sabah, has completed its GK Phase 2 project. The GK Phase 2 project involved the drilling of four additional subsea wells tied back to its semi Floating Production System (GK-Semi FPS). At

1 minutes read
  • LinkedIn
  • X
  • Email

Sabah Shell Petroleum, the operator of the Gumusut-Kakap (GK) semi Floating Production System located offshore Sabah, has completed its GK Phase 2 project.

The GK Phase 2 project involved the drilling of four additional subsea wells tied back to its semi Floating Production System (GK-Semi FPS).

At peak production, the four wells will add 50,000 barrels of oil equivalent per day to the GK-Semi FPS, sustaining its rated production capacity of 165,000 barrels per day. Located in water depths of 1,200 meters, the GK-Semi FPS was Shell’s first Deepwater development in Malaysia, starting production in 2014.

“ I would like to congratulate the team for yet another successful delivery of an important project for us both in Malaysia and globally, ” said Simon Durkin , vice-president, Malaysia Upstream.

“Shell has been a pioneer in Malaysia’s exploration and production sector for more than a century and a global leader in deep-water exploration and production for more than 40 years. We are proud of our continued investment in Malaysia and utilising our global and local expertise to ensure the long-term sustainability of Malaysia’s energy resources.”

In addition to its timely completion and excellent safety performance, the GK Phase 2 project has realized cost savings of more than 35% since taking final investment decision in Q4 2017.

The Gumusut-Kakap project is a joint venture between Shell (29%, operator), ConocoPhillips (29%), PETRONAS Carigali (16.8%), PTTEP Sabah Oil (6.4%), PERTAMINA (2.7%) and others.

Reach the Offshore Energy industry in one go!

Offshore Energy is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow Offshore Energy on:

Filed under

SubseaOperations & Maintenance

Daily Offshore Energy News in Your Mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1Methanol-ready energy subsea construction vessel arrives in Norway for completion
  2. 2Equinor employs 2009-built Odfjell Drilling rig for additional wells
  3. 3Nexans starts manufacturing 525 kV subsea cables for LanWin2 offshore wind grid connection
  4. 4More oil found at permit offshore Gabon

Daily Offshore Energy News in Your Mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free