Offshore Energy
  • Fossil Energy
  • Subsea
  • Alternative Fuels
  • Hydrogen
  • Marine Energy
  • More news
JobsNewsletter
Offshore Energy logo

Your trusted source for global offshore energy news, part of the Navingo network.

Topics
  • Fossil Energy
  • Subsea
  • Alternative Fuels
  • Hydrogen
  • Marine Energy
Network
  • Offshore Energy
  • Offshore Wind
  • NavalToday
  • Dredging Today
Company
  • Advertising
  • Newsletter
  • Jobs
  • Report your news
  • Privacy

© 2026 Navingo. All rights reserved.

Home›Dredging›Removing Sunken Dredging Barge from Alexandroupoli
Dredging

September 6, 2019 · about 7 years ago

Removing Sunken Dredging Barge from Alexandroupoli

Responding to a request from U.S. Naval Forces Europe and U.S. Army Europe to remove a sunken dredge barge from the Port of Alexandroupoli, Greece, NAVSEA Supervisor of Salvage and Diving, SEA 00C, has developed a plan and assembled a team to remove the barge and restore access to the pier for futur

1 minutes read
  • LinkedIn
  • X
  • Email

Responding to a request from U.S. Naval Forces Europe and U.S. Army Europe to remove a sunken dredge barge from the Port of Alexandroupoli, Greece, NAVSEA Supervisor of Salvage and Diving, SEA 00C, has developed a plan and assembled a team to remove the barge and restore access to the pier for future NATO missions.

The dredge barge Olga, which has laid on the harbor bottom since 2010, is over 150’ long and weighs approximately 800 metric tons.

The barge is laying on its side and blocking the center portion of the 500’ long cargo pier which represents a vital asset for NATO logistics operations.

Following a site survey in June, SUPSALV returned in early August with their team to begin vessel removal.

The team consists of NAVSEA salvage engineers, a salvage master from SUPSALV’s Atlantic region salvage contractor, DONJON, and a Greek salvage company, Five Oceans, supported by a local dive team.

Using the crane barge Hercules, the salvage team’s plan is to section the barge using a chopping beam (also known as a crane chisel) into 30-ton hull sections for lift and removal.

The team makes progress daily and plans to continue removal operations through the end of October when 500 ft of additional pier space in Alexandroupoli will be available for future NATO operations.

Reach the Offshore Energy industry in one go!

Offshore Energy is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow Offshore Energy on:

Filed under

DredgingBusiness & Finance

Daily Offshore Energy News in Your Mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1Seatrium picks up 9th FSRU conversion job with Karpowership
  2. 2122-meter subsea vessel continues charter with Reach Subsea through March 2028
  3. 3VARD opens new office in Vietnam, plans to grow to 40+ engineers
  4. 4$860M play for offshore oil assets powers Ithaca’s entry into Canadian energy game

Daily Offshore Energy News in Your Mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free