Offshore Energy
  • Fossil Energy
  • Subsea
  • Alternative Fuels
  • Hydrogen
  • Marine Energy
  • More news
JobsNewsletter
Offshore Energy logo

Your trusted source for global offshore energy news, part of the Navingo network.

Topics
  • Fossil Energy
  • Subsea
  • Alternative Fuels
  • Hydrogen
  • Marine Energy
Network
  • Offshore Energy
  • Offshore Wind
  • NavalToday
  • Dredging Today
Company
  • Advertising
  • Newsletter
  • Jobs
  • Report your news
  • Privacy

© 2026 Navingo. All rights reserved.

Home›Subsea›BHGI Completes Tailrace Buoy Design for NYPA
Subsea

August 12, 2019 · about 7 years ago

BHGI Completes Tailrace Buoy Design for NYPA

Bristol Harbor Group, Inc. (BHGI) was contracted by the New York Power Authority (NYPA) to provide naval architecture and marine engineering services to review and analyze a Canadian Coast Guard buoy for required internal ballast and mooring in order to secure the buoy moorings in tailrace waters. B

1 minutes read
  • LinkedIn
  • X
  • Email

Bristol Harbor Group, Inc. (BHGI) was contracted by the New York Power Authority (NYPA) to provide naval architecture and marine engineering services to review and analyze a Canadian Coast Guard buoy for required internal ballast and mooring in order to secure the buoy moorings in tailrace waters.

BHGI conducted a site visit at the Moses-Saunders Power Dam in Massena, NY. The purpose of the visit was to inspect the tailrace buoys currently installed downstream of the dam and to discuss possible new designs developments with NYPA’s engineers.

BHGI, assisted NYPA personnel, inspected all of the buoys currently installed while gathering data in field conditions and buoy performance.

BHGI produced a new tailrace buoy design, incorporating details of the Canadian Coast Guard buoy desired by NYPA. The new buoy also includes reoriented battery boxes for ease of maintenance; ballast compartments for adjustable trim; a taller tower to fit a larger, more visible warning sign and light; and an enhanced mooring system to assure secure placement and allow the buoy to self-deploy with only existing NYPA small boat support.

Computational Fluid Dynamics analyses was conducted on the new design to confirm the desired performance once deployed.

Reach the Offshore Energy industry in one go!

Offshore Energy is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow Offshore Energy on:

Filed under

SubseaBusiness & FinanceEquipmentProject & Tenders

Daily Offshore Energy News in Your Mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1
  2. 2
  3. 3
  4. 4

Daily Offshore Energy News in Your Mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free