Offshore Energy
  • Fossil Energy
  • Subsea
  • Alternative Fuels
  • Hydrogen
  • Marine Energy
  • More news
JobsNewsletter
Offshore Energy logo

Your trusted source for global offshore energy news, part of the Navingo network.

Topics
  • Fossil Energy
  • Subsea
  • Alternative Fuels
  • Hydrogen
  • Marine Energy
Network
  • Offshore Energy
  • Offshore Wind
  • NavalToday
  • Dredging Today
Company
  • Advertising
  • Newsletter
  • Jobs
  • Report your news
  • Privacy

© 2026 Navingo. All rights reserved.

Home›Dredging›EIS Available for San Francisco to Stockton Navigation Improvement
Dredging

May 13, 2019 · about 7 years ago

EIS Available for San Francisco to Stockton Navigation Improvement

The Draft General Reevaluation Report (GRR) and Environmental Impact Statement (EIS) for the San Francisco Bay to Stockton Navigation Improvement Project, prepared by the U.S. Army Corps of Engineers, is available for public review, said USACE in their latest announcement. The study area is a 13.2 m

1 minutes read
  • LinkedIn
  • X
  • Email

The Draft General Reevaluation Report (GRR) and Environmental Impact Statement (EIS) for the San Francisco Bay to Stockton Navigation Improvement Project, prepared by the U.S. Army Corps of Engineers, is available for public review, said USACE in their latest announcement.

The study area is a 13.2 mile length of navigation channel spanning central San Francisco Bay to Avon just east of the Benicia-Martinez Bridge and includes the Pinole Shoal Channel, and the Bulls Head Reach portion of the Suisun Bay Channel.

“Although the navigation channels in the study area are authorized to a depth of up to -45 feet mean lower low water (MLLW), the channels are currently maintained to only -35 feet MLLW,” said USACE.

The proposed project includes deepening the existing maintained channel depth of the Pinole Shoal Channel and Bulls Head Reach (Suisun Bay) from -35 feet to -38 feet MLLW, dredging a 2,600 foot sediment trap at Bulls Head Reach with a depth of -42 feet MLLW, plus 2 feet of overdepth, leveling the rock outcrop located to the west of Pinole Shoal from a peak of 39.7 feet MLLW to 43 feet MLLW, and using the dredged material at permitted beneficial reuse sites.

According to USACE, all comments should be submitted before June 24, 2019.

Reach the Offshore Energy industry in one go!

Offshore Energy is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow Offshore Energy on:

Filed under

DredgingBusiness & Finance

Daily Offshore Energy News in Your Mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1Yinson Production achieves industry-first non-Brazil FPSO project bond at $1.46 billion
  2. 2Golar secures 2013-built LNG carrier for conversion into fourth FLNG
  3. 3Lamprell tasks IMI with offshore platform and jacket fabrication scope
  4. 4'World-first' CCS platform for industrial decarbonization stands tall offshore UK

Daily Offshore Energy News in Your Mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free