Offshore Energy
  • Fossil Energy
  • Subsea
  • Alternative Fuels
  • Hydrogen
  • Marine Energy
  • More news
JobsNewsletter
Offshore Energy logo

Your trusted source for global offshore energy news, part of the Navingo network.

Topics
  • Fossil Energy
  • Subsea
  • Alternative Fuels
  • Hydrogen
  • Marine Energy
Network
  • Offshore Energy
  • Offshore Wind
  • NavalToday
  • Dredging Today
Company
  • Advertising
  • Newsletter
  • Jobs
  • Report your news
  • Privacy

© 2026 Navingo. All rights reserved.

Home›Offshore Wind›Giant Haliade-X 12MW Blade Comes Together
Offshore Wind

April 18, 2019 · about 7 years ago

Giant Haliade-X 12MW Blade Comes Together

LM Wind Power has produced the first blade for GE’s Haliade-X 12MW offshore wind turbine at its factory in Cherbourg, France. According to LM Wind Power, the 107m long blade, the world’s largest, has completed the molding process. The LM 107.0 P will now proceed with post-molding finishing touches,

1 minutes read
  • LinkedIn
  • X
  • Email

LM Wind Power has produced the first blade for GE’s Haliade-X 12MW offshore wind turbine at its factory in Cherbourg, France.

According to LM Wind Power, the 107m long blade, the world’s largest, has completed the molding process.

The LM 107.0 P will now proceed with post-molding finishing touches, before undergoing testing and validation to demonstrate its ability to withstand more than 20 years of operation offshore.

“The LM 107.0 P is one of the biggest single-components ever built. This is an amazing achievement not only for LM Wind Power and GE Renewable Energy, but for the entire wind industry,” said Lukasz Cejrowski , LM 107.0 P Project Director at LM Win Power.

GE Renewable Energy announced in March last year that it will invest more than USD 400 million to develop and deploy Haliade-X 12MW, the world’s most powerful offshore wind turbine.

The turbine is currently being assembled at GE’s factory in Saint-Nazaire, with tower sections being produced in Seville, Spain.

It will be installed in Maasvlakte-Rotterdam this summer and will be placed onshore to facilitate access for testing. The prototype is expected to allow the collection of data during the initial period of operations which is needed to obtain the Type Certificate in 2020 and ship first commercial units in 2021.

Reach the Offshore Energy industry in one go!

Offshore Energy is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow Offshore Energy on:

Filed under

Offshore WindResearch & Development

Daily Offshore Energy News in Your Mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1Yinson Production, PTSC cheer FSO’s first oil at Southeast Asian project
  2. 2DOF opts to sell 2018-built subsea vessel as attractive offer emerges
  3. 3Natural gas discovery springs up in India’s shallow waters
  4. 4Prysmian's 193-meter CLV Alessandro Volta performing sea trials

Daily Offshore Energy News in Your Mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free