Offshore Energy
  • Fossil Energy
  • Subsea
  • Alternative Fuels
  • Hydrogen
  • Marine Energy
  • More news
JobsNewsletter
Offshore Energy logo

Your trusted source for global offshore energy news, part of the Navingo network.

Topics
  • Fossil Energy
  • Subsea
  • Alternative Fuels
  • Hydrogen
  • Marine Energy
Network
  • Offshore Energy
  • Offshore Wind
  • NavalToday
  • Dredging Today
Company
  • Advertising
  • Newsletter
  • Jobs
  • Report your news
  • Privacy

© 2026 Navingo. All rights reserved.

Home›Subsea›PSA Probes Snorre Expansion Christmas Tree Fabrication
Subsea

March 18, 2019 · about 7 years ago

PSA Probes Snorre Expansion Christmas Tree Fabrication

Norway’s Petroleum Safety Authority (PSA) has carried out an audit of Equinor and the fabrication of the subsea Christmas tree for the Snorre expansion project. The objective of the audit was to ensure that fabrication of the subsea Christmas tree for the Snorre expansion project complied with the c

2 minutes read
  • LinkedIn
  • X
  • Email

Norway’s Petroleum Safety Authority (PSA) has carried out an audit of Equinor and the fabrication of the subsea Christmas tree for the Snorre expansion project.

The objective of the audit was to ensure that fabrication of the subsea Christmas tree for the Snorre expansion project complied with the company’s own requirements and requirements in the regulations. A sub-goal was to follow up how the project is undertaking its supervisory duty in respect of its supplier – TechnipFMC.

The audit, conducted in February this year did not identify any non-conformities, however, the PSA observed two areas with potential for improvement related to follow-up of suppliers and qualification of materials.

Snorre Expansion Project

In July, the Ministry of Petroleum and Energy approved the revised plan for development and operation (PDO) for further development of the Snorre field, called the Snorre Expansion Project (SEP).

The SEP is a major subsea development, and the largest improved recovery project on the Norwegian Shelf today. The project represents an investment that will contribute to 25 more years of production on Snorre.

The project comprises installation of six well templates with 24 wells that will be tied back to the Snorre A platform. The plan includes an option for further expansion with additional well templates. When production started on Snorre, the expected field life was up to 2011-2014. With the contribution from SEP, calculations show that the field can have profitable production all the way through 2040.

Reach the Offshore Energy industry in one go!

Offshore Energy is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow Offshore Energy on:

Filed under

SubseaBusiness & FinanceEquipmentResearch & Development

Daily Offshore Energy News in Your Mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1Yinson Production, PTSC cheer FSO’s first oil at Southeast Asian project
  2. 2DOF opts to sell 2018-built subsea vessel as attractive offer emerges
  3. 3Natural gas discovery springs up in India’s shallow waters
  4. 4Prysmian's 193-meter CLV Alessandro Volta performing sea trials

Daily Offshore Energy News in Your Mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free