Offshore Energy
  • Fossil Energy
  • Subsea
  • Alternative Fuels
  • Hydrogen
  • Marine Energy
  • More news
JobsNewsletter
Offshore Energy logo

Your trusted source for global offshore energy news, part of the Navingo network.

Topics
  • Fossil Energy
  • Subsea
  • Alternative Fuels
  • Hydrogen
  • Marine Energy
Network
  • Offshore Energy
  • Offshore Wind
  • NavalToday
  • Dredging Today
Company
  • Advertising
  • Newsletter
  • Jobs
  • Report your news
  • Privacy

© 2026 Navingo. All rights reserved.

Home›Subsea›Aker Solutions’ Subsea Compression System for Chevron’s Jansz-Io Field
Subsea

March 12, 2019 · about 7 years ago

Aker Solutions’ Subsea Compression System for Chevron’s Jansz-Io Field

Aker Solutions has secured a master contract to support the delivery of a subsea compression system for the Chevron Australia-operated Jansz-Io field. The first service order under the master contract will be for front-end engineering and design (FEED) of a subsea compression station that will boost

2 minutes read
  • LinkedIn
  • X
  • Email

Aker Solutions has secured a master contract to support the delivery of a subsea compression system for the Chevron Australia-operated Jansz-Io field.

The first service order under the master contract will be for front-end engineering and design (FEED) of a subsea compression station that will boost the recovery of gas from the field.

The FEED scope will also cover an unmanned power and control floater, as well as overall field system engineering services. The field control station will distribute onshore power to the subsea compression station.

“ Aker Solutions has worked closely with its partners MAN Energy Solutions and ABB to reduce the size and cost of the compression system, ” said Luis Araujo , chief executive officer at Aker Solutions. “We are excited to work with Chevron Australia on our compressor-technology to boost recovery at the Jansz-Io field.”

Compression will help maintain plateau gas production rates as reservoir pressure drops over time. While such compressors have typically been installed on platforms over sea level, placing them on the seabed and near the wellheads improves recovery rates and reduces capital and operating costs.

The Jansz-Io field is located around 200 kilometers offshore the north-west coast of Western Australia at approximately 1,350 meters below the surface. The Jansz-Io field is a part of the Chevron Australia-operated Gorgon Project, one of the world’s largest natural gas developments.

“ Australia will be the first place outside of Norway to use the subsea compression technology. Aker Solutions has been present in Western Australia for more than 20 years and we look forward to working collaboratively with the local industry on this development, ” added Araujo.

Reach the Offshore Energy industry in one go!

Offshore Energy is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow Offshore Energy on:

Filed under

SubseaEquipmentProject & Tenders

Daily Offshore Energy News in Your Mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1
  2. 2
  3. 3
  4. 4

Daily Offshore Energy News in Your Mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free