Offshore Energy
  • Fossil Energy
  • Subsea
  • Alternative Fuels
  • Hydrogen
  • Marine Energy
  • More news
JobsNewsletter
Offshore Energy logo

Your trusted source for global offshore energy news, part of the Navingo network.

Topics
  • Fossil Energy
  • Subsea
  • Alternative Fuels
  • Hydrogen
  • Marine Energy
Network
  • Offshore Energy
  • Offshore Wind
  • NavalToday
  • Dredging Today
Company
  • Advertising
  • Newsletter
  • Jobs
  • Report your news
  • Privacy

© 2026 Navingo. All rights reserved.

Home›Dredging›Greater Geraldton: Whitehill Road Coastal Work Wrapped Up
Dredging

January 22, 2019 · about 7 years ago

Greater Geraldton: Whitehill Road Coastal Work Wrapped Up

Construction of two low-crest groynes at the Whitehill Road designed to retain sand at the foreshore and reduce reliance on temporary sand nourishment has been completed, reports the City of Greater Geraldton. Commenting the latest news, the City Mayor, Shane Van Styn, said that installation of the

2 minutes read
  • LinkedIn
  • X
  • Email

Construction of two low-crest groynes at the Whitehill Road designed to retain sand at the foreshore and reduce reliance on temporary sand nourishment has been completed, reports the City of Greater Geraldton.

Commenting the latest news, the City Mayor, Shane Van Styn , said that installation of the two 40m long Geotextile Sand Container (GSC) groynes are consistent with community values and the City’s Coastal Hazard Risk Management and Adaptation Plan (CHRMAP) Report which aligns with Western Australia’s State Planning Policy No. 2.6 – State Coastal Planning Policy (SPP2.6).

“ During the development of the Geraldton CHRMAP the community told us loud and clear that the beaches at Drummond Cove are highly valued for social and recreational purposes, ” he said.

“ Therefore, the decision to build two GSC groynes that extend across the beach and into the ocean serves the dual purpose of trapping sand and maintaining the beach for community use.

“By utilising GSCs, they can be easily removed should they no longer be needed in the future.”

Now that coastal works are completed, the City is working with the community to improve the coastal reserve.

“ The City has received a request from the Drummond Cove Progress Association to replace the fences with bollards and return amenities such as shade shelters to the reserve that were removed due to coastal erosion, ” Mayor Van Styn said.

“ The City will continue closely working with the local community to ensure the best outcomes for local residents are achieved.”

Construction of the $250,000 groynes was undertaken by local contractor Red Dust Holdings with MP Rogers and Associated providing technical services. The project was funded via the City’s Coastal Adaptation Measures budget.

Reach the Offshore Energy industry in one go!

Offshore Energy is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow Offshore Energy on:

Filed under

DredgingBusiness & Finance

Daily Offshore Energy News in Your Mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1Eni sheds partial stakes in Indonesian gas assets as Pertamina and Medco bolster portfolios
  2. 2New wind for hydrogen-electric shipping as GMI-PowerCell collaboration expands to four bulk carriers
  3. 3AI, next-gen tech, and maritime decarbonization on RINA- China Merchants Energy Shipping pact’s agenda
  4. 4Stena Drilling’s 18-year-old drillship is on its way to Namibia

Daily Offshore Energy News in Your Mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free