Offshore Energy
  • Fossil Energy
  • Subsea
  • Alternative Fuels
  • Hydrogen
  • Marine Energy
  • More news
JobsNewsletter
Offshore Energy logo

Your trusted source for global offshore energy news, part of the Navingo network.

Topics
  • Fossil Energy
  • Subsea
  • Alternative Fuels
  • Hydrogen
  • Marine Energy
Network
  • Offshore Energy
  • Offshore Wind
  • NavalToday
  • Dredging Today
Company
  • Advertising
  • Newsletter
  • Jobs
  • Report your news
  • Privacy

© 2026 Navingo. All rights reserved.

Home›Dredging›Connecticut River Project on the Table
Dredging

January 17, 2019 · about 7 years ago

Connecticut River Project on the Table

The U.S. Army Corps of Engineers, New England District is proposing to perform a riverbank protection project to stabilize approximately 500 linear feet of riverbank along the Connecticut River in Lyme, New Hampshire. According to the Corps, erosion is occurring at a section of river bank along the

1 minutes read
  • LinkedIn
  • X
  • Email

The U.S. Army Corps of Engineers, New England District is proposing to perform a riverbank protection project to stabilize approximately 500 linear feet of riverbank along the Connecticut River in Lyme, New Hampshire.

According to the Corps, erosion is occurring at a section of river bank along the western side of River Road, just south of North Thetford Road in Lyme, where the bank is being undermined.

The proposed action consists of placing a stone revetment along a 500-linear-foot section of eroding Connecticut River bank located south of North Thetford Road, and running parallel to River Road. The stone revetment was considered to be the most practical solution to alleviate the erosion problems affecting the area.

To construct the revetment, approximately 5,100 cubic yards of interlocking, 18-inch riprap stone will be placed along the 500-linear foot segment of eroding bank.

The initial phase will involve the excavation of the eroding bank to create a constant slope, as well as to establish a stable foundation for the riprap slope. The bedding material will be composed of an initial 1-foot layer of sand followed by another 1-foot layer of gravel before the larger stone is placed.

The public notice, with more detailed information, is available for review on the Corps website .

Reach the Offshore Energy industry in one go!

Offshore Energy is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow Offshore Energy on:

Filed under

DredgingBusiness & Finance

Daily Offshore Energy News in Your Mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1Eni sheds partial stakes in Indonesian gas assets as Pertamina and Medco bolster portfolios
  2. 2New wind for hydrogen-electric shipping as GMI-PowerCell collaboration expands to four bulk carriers
  3. 3AI, next-gen tech, and maritime decarbonization on RINA- China Merchants Energy Shipping pact’s agenda
  4. 4Stena Drilling’s 18-year-old drillship is on its way to Namibia

Daily Offshore Energy News in Your Mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free