Offshore Energy
  • Fossil Energy
  • Subsea
  • Alternative Fuels
  • Hydrogen
  • Marine Energy
  • More news
JobsNewsletter
Offshore Energy logo

Your trusted source for global offshore energy news, part of the Navingo network.

Topics
  • Fossil Energy
  • Subsea
  • Alternative Fuels
  • Hydrogen
  • Marine Energy
Network
  • Offshore Energy
  • Offshore Wind
  • NavalToday
  • Dredging Today
Company
  • Advertising
  • Newsletter
  • Jobs
  • Report your news
  • Privacy

© 2026 Navingo. All rights reserved.

Home›Dredging›Shropshire Union Canal Re-Opens Following £3M Repairs
Dredging

December 25, 2018 · about 7 years ago

Shropshire Union Canal Re-Opens Following £3M Repairs

The Shropshire Union Canal, Middlewich branch, in Cheshire, was re-opened on Friday, 21 December, following repairs to a major breach after a section of the 200-year-old embankment washed away into the River Wheelock below in March. As Canal & River Trust reports, more than 4,000 tonnes of stones wa

2 minutes read
  • LinkedIn
  • X
  • Email

The Shropshire Union Canal, Middlewich branch, in Cheshire, was re-opened on Friday, 21 December, following repairs to a major breach after a section of the 200-year-old embankment washed away into the River Wheelock below in March.

As Canal & River Trust reports, more than 4,000 tonnes of stones was used to rebuild the canal embankment so that it can be refilled with water and can once again be enjoyed by boaters, walkers, runners and the local community.

The work cost nearly £3 million and was funded by the Trust as well as players of People’s Postcode Lottery. Generous donations from the local community also raised over £30,000 for the emergency appeal.

Contractors, Kier and CPC Civils, on behalf of the Trust, have rebuilt the 12m high embankment prior to constructing new concrete canal walls, a PVC lining membrane and concrete protection slab as well as reinstating the towpath in preparation for the reopening.

Andy Johnson, the senior project manager said: “ We’ve been working hard on site to repair the canal as quickly as we could. We faced some complex challenges like removing stranded boats and access along the canal bed to reach the breach but we’re pleased that we can re-open the canal before Christmas.”

Andy also added that they still have some work to do on site in January and “ we might need to close the towpath at times early in the New Year to complete the work ”.

Reach the Offshore Energy industry in one go!

Offshore Energy is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow Offshore Energy on:

Filed under

DredgingBusiness & FinanceProject & Tenders

Daily Offshore Energy News in Your Mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1Eni sheds partial stakes in Indonesian gas assets as Pertamina and Medco bolster portfolios
  2. 2New wind for hydrogen-electric shipping as GMI-PowerCell collaboration expands to four bulk carriers
  3. 3AI, next-gen tech, and maritime decarbonization on RINA- China Merchants Energy Shipping pact’s agenda
  4. 4Stena Drilling’s 18-year-old drillship is on its way to Namibia

Daily Offshore Energy News in Your Mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free