Offshore Energy
  • Fossil Energy
  • Subsea
  • Alternative Fuels
  • Hydrogen
  • Marine Energy
  • More news
JobsNewsletter
Offshore Energy logo

Your trusted source for global offshore energy news, part of the Navingo network.

Topics
  • Fossil Energy
  • Subsea
  • Alternative Fuels
  • Hydrogen
  • Marine Energy
Network
  • Offshore Energy
  • Offshore Wind
  • NavalToday
  • Dredging Today
Company
  • Advertising
  • Newsletter
  • Jobs
  • Report your news
  • Privacy

© 2026 Navingo. All rights reserved.

Home›Wind Farms›Ulstein Cuts First Steel for Merkur SOV
Wind Farms

September 10, 2018 · about 8 years ago

Ulstein Cuts First Steel for Merkur SOV

Norwegian ship designer and shipbuilder Ulstein has cut the first steel for a Service Operations Vessel (SOV) ordered by Bernhard Schulte. The SOV yard number 315 is of the SX195 design from Ulstein, and is destined to operate for GE Renewable Energy on the Merkur offshore wind farm in the German No

1 minutes read
  • LinkedIn
  • X
  • Email

Norwegian ship designer and shipbuilder Ulstein has cut the first steel for a Service Operations Vessel (SOV) ordered by Bernhard Schulte.

The SOV yard number 315 is of the SX195 design from Ulstein, and is destined to operate for GE Renewable Energy on the Merkur offshore wind farm in the German North Sea.

The vessel is the third SOV to be constructed by Ulstein for Bernhard Schulte and is a longer version of the two previous vessels. She will come equipped with the X-STERN, same as the previous two vessels: Windea La Cour and Windea Leibniz .

The new SOV will have a centrally positioned walk-to-work motion compensated gangway and elevator tower for personnel and cargo transfers, as well as a 3D compensated crane, and will provide accommodation for 120 persons.

The 396MW Merkur offshore wind farm is currently under construction and is expected to be commissioned in 2019.

Following the delivery of the vessel in early 2020, GE Renewable Energy will use the SOV for the maintenance of the wind farm’s 66 Haliade 150-6MW turbines.

Photos: Ulstein

Reach the Offshore Energy industry in one go!

Offshore Energy is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow Offshore Energy on:

Filed under

Wind FarmsOperations & Maintenance

Daily Offshore Energy News in Your Mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1Yinson Production achieves industry-first non-Brazil FPSO project bond at $1.46 billion
  2. 2Golar secures 2013-built LNG carrier for conversion into fourth FLNG
  3. 3Lamprell tasks IMI with offshore platform and jacket fabrication scope
  4. 4'World-first' CCS platform for industrial decarbonization stands tall offshore UK

Daily Offshore Energy News in Your Mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free