Offshore Energy
  • Fossil Energy
  • Subsea
  • Alternative Fuels
  • Hydrogen
  • Marine Energy
  • More news
JobsNewsletter
Offshore Energy logo

Your trusted source for global offshore energy news, part of the Navingo network.

Topics
  • Fossil Energy
  • Subsea
  • Alternative Fuels
  • Hydrogen
  • Marine Energy
Network
  • Offshore Energy
  • Offshore Wind
  • NavalToday
  • Dredging Today
Company
  • Advertising
  • Newsletter
  • Jobs
  • Report your news
  • Privacy

© 2026 Navingo. All rights reserved.

Home›Subsea›Marine Survey Underway for Huawei Marine Megacable Project
Subsea

August 24, 2018 · about 8 years ago

Marine Survey Underway for Huawei Marine Megacable Project

Huawei Marine and Megacable have informed that work is underway on marine survey for the Topolobambo – La Paz project. The submarine cable system should provide more stable and low-latency communication for La Paz, Mexico’s second largest tourist destination. Located at the southern end of the Baja

1 minutes read
  • LinkedIn
  • X
  • Email

Huawei Marine and Megacable have informed that work is underway on marine survey for the Topolobambo – La Paz project.

The submarine cable system should provide more stable and low-latency communication for La Paz, Mexico’s second largest tourist destination.

Located at the southern end of the Baja California Peninsula, La Paz’s communication connection to Mexico’s mainland currently is via the Peninsula’s terrestrial fiber system.

The new cable system will connect La Paz directly to Topolobambo on the mainland via an undersea cable across the Gulf of California. This solution promises to solve the problem of high of failure rates caused by aerial optical cables and should help customers develop new services in the region.

The Topolobambo – La Paz submarine cable system is a 250km unrepeatered submarine cable system with 24 fiber pairs. The system, which will have a capacity of 192Tb/s, is planned for delivery in Q2 2019.

“With the La Paz project Huawei Marine’s technology and service capabilities are once again recognized by customers in Latin America,” said Zhaofeng Chen , planning design director of Huawei Marine. “The terrain and environment in the Gulf and Peninsula region is complex and places high requirements on the design and construction of the submarine cable. Huawei Marine’s rich experience in working on difficult projects around the world will ensure the Topolobambo – La Paz project will be completed smoothly.”

Reach the Offshore Energy industry in one go!

Offshore Energy is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow Offshore Energy on:

Filed under

SubseaBusiness & FinanceEquipmentOperations & Maintenance

Daily Offshore Energy News in Your Mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1Rig incident: 110 rescued, 5 still missing after Borr Drilling’s jack-up sinks off Gabon coast
  2. 2Yinson Production, PTSC cheer FSO’s first oil at Southeast Asian project
  3. 3DOF opts to sell 2018-built subsea vessel as attractive offer emerges
  4. 4Natural gas discovery springs up in India’s shallow waters

Daily Offshore Energy News in Your Mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free