Offshore Energy
  • Fossil Energy
  • Subsea
  • Alternative Fuels
  • Hydrogen
  • Marine Energy
  • More news
JobsNewsletter
Offshore Energy logo

Your trusted source for global offshore energy news, part of the Navingo network.

Topics
  • Fossil Energy
  • Subsea
  • Alternative Fuels
  • Hydrogen
  • Marine Energy
Network
  • Offshore Energy
  • Offshore Wind
  • NavalToday
  • Dredging Today
Company
  • Advertising
  • Newsletter
  • Jobs
  • Report your news
  • Privacy

© 2026 Navingo. All rights reserved.

Home›Wind Farms›NGI Keeping an Eye On Borkum Riffgrund 2 Jackets
Wind Farms

August 23, 2018 · about 8 years ago

NGI Keeping an Eye On Borkum Riffgrund 2 Jackets

The Norwegian Geotechnical Institute (NGI) has designed and installed Structural Health Monitoring (SHM) systems on two of 20 suction bucket jackets at Ørsted’s Borkum Riffgrund 2 offshore wind farm.

1 minutes read
  • LinkedIn
  • X
  • Email

The Norwegian Geotechnical Institute (NGI) has designed and installed Structural Health Monitoring (SHM) systems on two of 20 suction bucket jackets at Ørsted’s Borkum Riffgrund 2 offshore wind farm.

The provision of the monitoring technology is part of NGI’s multidisciplinary engagement in the project which saw the institute provide a detailed geotechnical design of the bucket foundations in cooperation with Ørsted.

The systems allow the Danish developer to monitor and verify the behavior of the jackets during the operational lifetime of the wind farm and are expected to give data for further optimization for future projects.

The project includes a total of 325 sensors and 22km of cabling routed through the system, with the logging handled by two custom-built DAQ systems.

NGI said it designed, installed and delivered the instrumentation and monitoring systems based on the successful application at the Borkum Riffgrund 1 project.

To remind, GeoSea’s jack-up vessel Innovation installed the last suction bucket jacket foundations on Borkum Riffgrund 2 in the German North Sea at the end of July.

The 450MW project will comprise a total of 56 turbines mounted 36 monopiles, in addition to the 20 suction buckets, expected to be fully commissioned in early 2019.

Reach the Offshore Energy industry in one go!

Offshore Energy is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow Offshore Energy on:

Filed under

Wind FarmsTechnology

Daily Offshore Energy News in Your Mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1Yinson Production achieves industry-first non-Brazil FPSO project bond at $1.46 billion
  2. 2Golar secures 2013-built LNG carrier for conversion into fourth FLNG
  3. 3Lamprell tasks IMI with offshore platform and jacket fabrication scope
  4. 4'World-first' CCS platform for industrial decarbonization stands tall offshore UK

Daily Offshore Energy News in Your Mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free